Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/8231
Title: Optimization of physical assets maintenance using terotechnology : A Case Study of Sea Ports Corporation, dockyard work shop
Other Titles: ترشيد الصيانة للأصول باستخدام التروتكنولوجى : دراسة حاله ورشه الحوض بهيئة المواني البحرية
Authors: Eltom, Elhussien Mohamed
Supervisor - Elkhawad Ali Elfaki
Keywords: Mechanical Engineering
physical assets maintenance
terotechnology
Sea Ports Corporation, dockyard work shop
maintenance
Issue Date: 1-Oct-2010
Publisher: Sudan University of Science and Technology
Citation: Eltom,Elhussien Mohamed.Optimization of physical assets maintenance using terotechnology : A Case Study of Sea Ports Corporation, dockyard work shop/Elhussien Mohamed Eltom;Elkhawad Ali Elfaki.-Kartoum:Sudan University of Science and Technology,College of Engineering,2010.-93P. : ill. ; 28Cm.-M.Sc.
Abstract: Maintenance should be economized, and to do that we should look at it from a terotechnological point of view, all its practices (Engineering, management and financial) , from asset specification up to its disposal or replacement interact to pursuit its economic life cost, using necessary tools to develop maintenance procedures. This study is directed mainly towards use of terotechnology techniques for sea ports corporation dockyard workshop physical assets maintenance optimization. Microsoft office Accesses (xp) soft ware program for system information. Primavera project planner (p3) soft ware program for project planning and managing. Statistic and reliability theory for asset performance measurement. Root cause analysis for fault diagnoses and optimize machine utilization. Microsoft office excel program for replacement analysis. The application of terotechnology concept in assets maintenance, total life time cost is minimized. Ultimately through application of terotechnology tools we achieve:- 1) Good planning and controlling for the project. 2) Optimum utilization of resources. 3) More information for decision making. (See reports attached.) 4) Information provided can provide a basis for forming long-term plans. 5) Improved in availability system. 6) High product quality. 7) Improve in system efficiency and effectiveness.
Description: Thesis
URI: http://repository.sustech.edu/handle/123456789/8231
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Optimization of physical assets...pdftitle22.4 kBAdobe PDFView/Open
Abstract.pdfAbstract899.22 kBAdobe PDFView/Open
Research.pdf
  Restricted Access
Research3.71 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.