Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/8231
Full metadata record
DC FieldValueLanguage
dc.contributor.authorEltom, Elhussien Mohamed
dc.contributor.authorSupervisor - Elkhawad Ali Elfaki
dc.date.accessioned2014-11-25T10:05:07Z
dc.date.available2014-11-25T10:05:07Z
dc.date.issued2010-10-01
dc.identifier.citationEltom,Elhussien Mohamed.Optimization of physical assets maintenance using terotechnology : A Case Study of Sea Ports Corporation, dockyard work shop/Elhussien Mohamed Eltom;Elkhawad Ali Elfaki.-Kartoum:Sudan University of Science and Technology,College of Engineering,2010.-93P. : ill. ; 28Cm.-M.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/8231
dc.descriptionThesisen_US
dc.description.abstractMaintenance should be economized, and to do that we should look at it from a terotechnological point of view, all its practices (Engineering, management and financial) , from asset specification up to its disposal or replacement interact to pursuit its economic life cost, using necessary tools to develop maintenance procedures. This study is directed mainly towards use of terotechnology techniques for sea ports corporation dockyard workshop physical assets maintenance optimization. Microsoft office Accesses (xp) soft ware program for system information. Primavera project planner (p3) soft ware program for project planning and managing. Statistic and reliability theory for asset performance measurement. Root cause analysis for fault diagnoses and optimize machine utilization. Microsoft office excel program for replacement analysis. The application of terotechnology concept in assets maintenance, total life time cost is minimized. Ultimately through application of terotechnology tools we achieve:- 1) Good planning and controlling for the project. 2) Optimum utilization of resources. 3) More information for decision making. (See reports attached.) 4) Information provided can provide a basis for forming long-term plans. 5) Improved in availability system. 6) High product quality. 7) Improve in system efficiency and effectiveness.en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectMechanical Engineeringen_US
dc.subjectphysical assets maintenanceen_US
dc.subjectterotechnologyen_US
dc.subjectSea Ports Corporation, dockyard work shopen_US
dc.subjectmaintenanceen_US
dc.titleOptimization of physical assets maintenance using terotechnology : A Case Study of Sea Ports Corporation, dockyard work shopen_US
dc.title.alternativeترشيد الصيانة للأصول باستخدام التروتكنولوجى : دراسة حاله ورشه الحوض بهيئة المواني البحريةen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Optimization of physical assets...pdftitle22.4 kBAdobe PDFView/Open
Abstract.pdfAbstract899.22 kBAdobe PDFView/Open
Research.pdf
  Restricted Access
Research3.71 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.