SUST Repository

Developing aSudaneseoilfield Reservoirand Production Engineering Aspects

Show simple item record

dc.contributor.author Ahmed, Abuzar AbdEllatif Ahmed Musa
dc.contributor.author Osman, Abdeen Abdelrahman Dafallah
dc.contributor.author Osman, bdElgalil Awad
dc.contributor.author Altaher, Mohammed Salman Alqurashi
dc.contributor.author Supervisor, - MohandMahjoubKhairy
dc.date.accessioned 2017-12-03T12:04:30Z
dc.date.available 2017-12-03T12:04:30Z
dc.date.issued 2017-06-07
dc.identifier.citation Ahmed, Abuzar AbdEllatif Ahmed Musa . Developing aSudaneseoilfield Reservoirand Production Engineering Aspects: Case study- Haraz field \ AbuzarAbdEllatifAhmedMusaAhmed ,AbdeenAbdelrahmanDafallahOsman ...{etal} ;MohandMahjoubKhairy.-khartoum: Sudan University of Science & Technology, College of Petroleum Engineering and Technology, 2017.-55P:ill; 28cm.-Bachelors search en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/19208
dc.description Bachelor Research en_US
dc.description.abstract Field development planning comprises a great amount of investments and involves a high number of parameters related to the geological and structural characteristics of the reservoir, to the operational scheduling and the economic scenario. The importance of this problem demands the elaboration of methodologies that can help in the management decision making process, leading to better recovery strategies that increase both reserves and profitability of reservoirs. The main objective of this work is to employ an efficient optimization technique to identify a sound field development plan for Haraz field. Optimized parameters include number of well, well placement, Production scheme for all wells and network design regardless of economic evaluation. Two major scenarios were implemented to the model by using dynamic numerical reservoir simulator (ECLIPSE). In the first scenario the field was developed by implemented several vertical wells (2, 4, 6, 8) to the base case (2vertical well), in the second scenario the field was developed by implemented 3 horizontal wells to the base case (2vertical well). The result shows that the best scenario is to implement 8 vertical wells (2 wells in base case) and the optimum cumulative oil production is 3.05 MMBO with recovery factor = 14.6%. The optimization in this study was based only on the recovery factor, oil production rate and the cumulative production during the simulation time. The best scenario (8 vertical wells) is used in constructing production network system to connect the wells by using steady-state production network simulator (PIPESIM). The network system will allow producer to interact with production facilities to make a stable system in producing fluid en_US
dc.description.sponsorship Sudan University of Science & Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Petroleum Engineering and Technology en_US
dc.subject Developing a Sudanese en_US
dc.title Developing aSudaneseoilfield Reservoirand Production Engineering Aspects en_US
dc.title.alternative تطوير حقل نفط سودانيإعتباراتهندسة المكامنوالانتاج en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account