SUST Repository

The Challenges of Implementing Telecommunication Projects in Sudan

Show simple item record

dc.contributor.advisor
dc.contributor.author Taha, Mohammed Abdou Imam
dc.contributor.author Supervisor - MudathirSulieman Mohamed Ali
dc.date.accessioned 2015-11-22T07:58:46Z
dc.date.available 2015-11-22T07:58:46Z
dc.date.issued 2015-09-10
dc.identifier.citation Taha,Mohammed Abdou Imam .The Challenges of Implementing Telecommunication Projects in Sudan :A Case study Phase-H Network Expansion Project /Mohammed Abdou Imam Taha ;MudathirSulieman Mohamed Ali .-khartoum :Sudan University of Science and Technology,COLLEGE OF ENGINEERING ,2015 .-83p. :ill. ;28cm .-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/11962
dc.description Thesis en_US
dc.description.abstract The Study talks about the challenges of implementing telecommunications projectsin Sudan through four chapters: project selection, selection of the team, the organization and the impact and influence of external factors. And that with modern references and that the importance of these factors in the field of accelerating communications. Which it should be referred to the detailed study for the (Phase-H Networks Expansion Project) as main activities: Network Design &Planning Site Survey Site Selection and Validation Site Acquisition Soil investigation Site Design and Development Site Construction Installation and Commissioning Acceptance and Integrations (site on air stage). During the study we have enough space about the inflation event 2012 in Sudan, with complex and multi-dimensional and compound impact. Which has an important role in rising costs? The project contractors rejected to continue the work until PMO, Sudatel Group increase the remaining work 25%. For innovative solutions to the problems facing us and the importance of this project has been our intention from which, contrary to what has been set of procedures and quality in order to be given to those who are knocking on the field. We use Sand Modeling Foundation (SMF) Tower for temporary sites and areas that have difficulty to transport materials. The information and documents selected and revised for those who need to go forward in this field. en_US
dc.description.sponsorship SUDAN UNIVERSITY OF SCIENCE AND TECHNOLOGY en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject CIVIL ENGINEERING en_US
dc.subject Telecommunication in Sudan en_US
dc.subject Network Expansion en_US
dc.title The Challenges of Implementing Telecommunication Projects in Sudan en_US
dc.title.alternative تحديات تنفيذ مشاريع الإتصالات في السودان en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account