Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/7960
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAhmed, Mohammed Abdulla
dc.contributor.authorSupervisor - Sabir Mohammed Salih
dc.date.accessioned2014-11-12T06:37:07Z
dc.date.available2014-11-12T06:37:07Z
dc.date.issued2006-11-01
dc.identifier.citationAhmed,Mohammed Abdulla .Uprating of Hydropower Plants : Case Study Rosaries and Algerba Hydropower Station/Mohammed Abdulla Ahmed;Sabir Mohammed Salih.-Khartoum:Sudan University of Science and Technology,College of Engineering,2006.-63P. : ill. : 28Cm.-M.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/7960
dc.descriptionThesisen_US
dc.description.abstractRosaries and Algerba Hydropower Plants were done respectively. This study shows briefly the technical data of both plants, it also describes the steps and procedures of the uprating ,and discusses the results of uprating according to the contract with National Electrity Corporation and according to the Standard Regulations and Modernization methods that have been applied in different projects in the world. The study shows different equations and procedures, and compares the results with that done in the hydropower plant in the Sudan, also the total cost of uprating compared with similar units in different projects. Finally it is believed that the uprating done in the both plants did not lead to improve the efficieny according to international standards , but uprating done in Rosaries Hydropower plant is more effective than that in the other plant because of low cost , improvement in efficiency , with only increased discharge ( no change in other parameter ).en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectMECHANICAL ENGINEERINGen_US
dc.subjectHydropower Stationen_US
dc.subjectHydropower Plantsen_US
dc.subjectRosariesen_US
dc.subjectAlgerbaen_US
dc.titleUprating of Hydropower Plants : Case Study Rosaries and Algerba Hydropower Stationen_US
dc.title.alternativeرفع معدل انتاج محطات التوليد المائيةen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Uprating of Hydropower Plants ...pdf
  Restricted Access
search4.6 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.