Title: Upgrading of Earthing System for Kilo-10 Substation
Other Titles: ترقية نظام التأريض لمحطة كيلو عشرة التحويلية
Authors: Ibrahim, Murtada Adam Abdurrahman
Supervisor,- Mohammed Osman Hassan
Keywords: Electrical Engineering
Power
Upgrade grounding system
Ten kilometers manufacturing plant
Issue Date: 10-Jan-2016
Publisher: Sudan University of Science and Technology
Citation: Ibrahim , Murtada Adam Abdurrahman . Upgrading of Earthing System for Kilo-10 Substation / Murtada Adam Abdurrahman Ibrahim ; Mohammed Osman Hassan .- Khartoum: Sudan University of Science and Technology, College of Engineering, 2016 .- 74p. :ill. ;28cm .-M.Sc.
Abstract: This project aims to Upgrading of Earthing System for Kilo-x Substation, Components starting from the current transformers, voltage transformers, power transformers, lightning arresters, circuit breakers and bus-bar arrangement. The project also provides ground grid system by using ETAP software program because it is easy to Upgrading and calculate the step potential, the touch potential, the total length of Earthing mat conductors, the size of Earthing mat conductors and the total number of Earthing rod in order to reach the best possible Upgrading of Earthing System for Kilo-x Substation. Kilo-X substation was implemented as the study case, from simulation results obtained, there is a difference between the existing ground design scheme and that obtained with ETAP.
Description: Thesis
URI: http://repository.sustech.edu/handle/123456789/13005
Appears in Collections:Masters Dissertations : Engineering