https://repository.sustech.edu/handle/123456789/13005| Title: | Upgrading of Earthing System for Kilo-10 Substation |
| Other Titles: | ترقية نظام التأريض لمحطة كيلو عشرة التحويلية |
| Authors: | Ibrahim, Murtada Adam Abdurrahman Supervisor,- Mohammed Osman Hassan |
| Keywords: | Electrical Engineering Power Upgrade grounding system Ten kilometers manufacturing plant |
| Issue Date: | 10-Jan-2016 |
| Publisher: | Sudan University of Science and Technology |
| Citation: | Ibrahim , Murtada Adam Abdurrahman . Upgrading of Earthing System for Kilo-10 Substation / Murtada Adam Abdurrahman Ibrahim ; Mohammed Osman Hassan .- Khartoum: Sudan University of Science and Technology, College of Engineering, 2016 .- 74p. :ill. ;28cm .-M.Sc. |
| Abstract: | This project aims to Upgrading of Earthing System for Kilo-x Substation, Components starting from the current transformers, voltage transformers, power transformers, lightning arresters, circuit breakers and bus-bar arrangement. The project also provides ground grid system by using ETAP software program because it is easy to Upgrading and calculate the step potential, the touch potential, the total length of Earthing mat conductors, the size of Earthing mat conductors and the total number of Earthing rod in order to reach the best possible Upgrading of Earthing System for Kilo-x Substation. Kilo-X substation was implemented as the study case, from simulation results obtained, there is a difference between the existing ground design scheme and that obtained with ETAP. |
| Description: | Thesis |
| URI: | http://repository.sustech.edu/handle/123456789/13005 |
| Appears in Collections: | Masters Dissertations : Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Upgrading of Earthing ... .pdf | Research | 1.92 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.