Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/11962
Full metadata record
DC FieldValueLanguage
dc.contributor.advisor
dc.contributor.authorTaha, Mohammed Abdou Imam
dc.contributor.authorSupervisor - MudathirSulieman Mohamed Ali
dc.date.accessioned2015-11-22T07:58:46Z
dc.date.available2015-11-22T07:58:46Z
dc.date.issued2015-09-10
dc.identifier.citationTaha,Mohammed Abdou Imam .The Challenges of Implementing Telecommunication Projects in Sudan :A Case study Phase-H Network Expansion Project /Mohammed Abdou Imam Taha ;MudathirSulieman Mohamed Ali .-khartoum :Sudan University of Science and Technology,COLLEGE OF ENGINEERING ,2015 .-83p. :ill. ;28cm .-M.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/11962
dc.descriptionThesisen_US
dc.description.abstractThe Study talks about the challenges of implementing telecommunications projectsin Sudan through four chapters: project selection, selection of the team, the organization and the impact and influence of external factors. And that with modern references and that the importance of these factors in the field of accelerating communications. Which it should be referred to the detailed study for the (Phase-H Networks Expansion Project) as main activities: Network Design &Planning Site Survey Site Selection and Validation Site Acquisition Soil investigation Site Design and Development Site Construction Installation and Commissioning Acceptance and Integrations (site on air stage). During the study we have enough space about the inflation event 2012 in Sudan, with complex and multi-dimensional and compound impact. Which has an important role in rising costs? The project contractors rejected to continue the work until PMO, Sudatel Group increase the remaining work 25%. For innovative solutions to the problems facing us and the importance of this project has been our intention from which, contrary to what has been set of procedures and quality in order to be given to those who are knocking on the field. We use Sand Modeling Foundation (SMF) Tower for temporary sites and areas that have difficulty to transport materials. The information and documents selected and revised for those who need to go forward in this field.en_US
dc.description.sponsorshipSUDAN UNIVERSITY OF SCIENCE AND TECHNOLOGYen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectCIVIL ENGINEERINGen_US
dc.subjectTelecommunication in Sudanen_US
dc.subjectNetwork Expansionen_US
dc.titleThe Challenges of Implementing Telecommunication Projects in Sudanen_US
dc.title.alternativeتحديات تنفيذ مشاريع الإتصالات في السودانen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
The Challenges of Implementing ...pdfResearch3.12 MBAdobe PDFView/Open
G-6083-NLN-Shabasha-02.pdfAppendix3.26 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.