dc.contributor.author |
Nayle, Ghassan Faisal |
|
dc.contributor.author |
Ahmed, Khalil Haroun |
|
dc.contributor.author |
Mohammed, Mohammed Abdelbagi |
|
dc.contributor.author |
Yousef, Mohammed Kamal |
|
dc.contributor.author |
Supervisor, - Fatima Khaled Khider |
|
dc.date.accessioned |
2021-03-11T12:02:28Z |
|
dc.date.available |
2021-03-11T12:02:28Z |
|
dc.date.issued |
2020-11-01 |
|
dc.identifier.citation |
Nayle, Ghassan Faisal.Reservoir surveillance for water cut diagnoses –case study field (x)\Ghassan Faisal Nayle...{etal};Fatima Khaled Khider.-Khartoum:Sudan University of Science & Technology,College of Petroleum Engineering & Technology,2020.-51p.:ill.;28cm.-Bachelors Search. |
en_US |
dc.identifier.uri |
http://repository.sustech.edu/handle/123456789/25825 |
|
dc.description |
Bachelors Search |
en_US |
dc.description.abstract |
Reservoir management is the most important aspects that control and monitoring performance of work in the field, and the main role of reservoir management is receive the data that comes from the filed or reservoir and analyze it to get results that help to make the right decisions and give practical suggestions to improve the performance of well and therefore increase the production rate.
The project aims to decrease uncertainties of the monitored and analyzed well by one of the techniques of well surveillance which focus on directing the crew existing in the field during lifecycle of the project and follow the progress of the work until the end, and maintaining the production rate of oil higher than production rate of water and set clear solutions to treat the water production problem with prediction the future outcomes that may occur.
Oil field manager software (OFM) used to analyze the reservoir data which obtained from the field and extracted production reports that contained the production rates of oil, gas and water to present the events and problems graphically therefore to organize, analyze and interpret the data, and we found that we can solve the water production by plugging the perforation that producing water with cementing squeeze, and make a new perforation earlier than previous perforation. |
en_US |
dc.description.sponsorship |
Sudan University of Science & Technology |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
Sudan University of Science & Technology |
en_US |
dc.subject |
Reservoir surveillance |
en_US |
dc.subject |
water cut diagnoses |
en_US |
dc.title |
Reservoir surveillance for water cut diagnoses –case study field (x) |
en_US |
dc.title.alternative |
مراقبة المكمن لتشخيص المياه المنتجة مع الزيت – دراسة حالة الحقل(x) |
en_US |
dc.type |
Thesis |
en_US |