SUST Repository

Investigating Rise Of Voltage In Atbara-Portsudan Transmission Line

Show simple item record

dc.contributor.author Arzon, Mutaz Ibrahim Hassan
dc.contributor.author Supervisor, -ELmubarak Mohammed Mohammed Shamoug
dc.date.accessioned 2020-01-02T10:50:53Z
dc.date.available 2020-01-02T10:50:53Z
dc.date.issued 2016-10-15
dc.identifier.citation Arzon, Mutaz Ibrahim Hassan .Investigating Rise Of Voltage In Atbara-Portsudan Transmission Line \ Mutaz Ibrahim Hassan Arzon ; ELmubarak Mohammed Mohammed Shamoug .- Khartoum:Sudan University of Science and Technology,College of Engineering,2016.-43p. : ill. ; 28cm.-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/24341
dc.description Thesis en_US
dc.description.abstract The Transmission Plan forms part of the National Electricity Corporation (NEC) Long Term Power System Planning Study (LTPSPS). The Transmission Plan for the Sudan for the period from 2006 to 2030. Identifies the required expansion of the NEC transmission system over the planning period to accommodate the power generation levels detailed in the Generation Plan Report and the levels of demand identified in the Demand Forecast Report. This report includes both the transmission system data and the results of detailed studies based on that data................................ en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Engineering en_US
dc.subject Electrical Engineering en_US
dc.subject Investigating Rise en_US
dc.subject Voltage In Atbara-Portsudan Transmission Line en_US
dc.title Investigating Rise Of Voltage In Atbara-Portsudan Transmission Line en_US
dc.title.alternative تقصي إرتفاع الجهد في خط النقل الرابط بين عطبرة وبورتسودان en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account