Abstract:
The Transmission Plan forms part of the National Electricity Corporation (NEC) Long Term Power System Planning Study (LTPSPS).
The Transmission Plan for the Sudan for the period from 2006 to 2030. Identifies the required expansion of the NEC transmission system over the planning period to accommodate the power generation levels detailed in the Generation Plan Report and the levels of demand identified in the Demand Forecast Report.
This report includes both the transmission system data and the results of detailed studies based on that data................................