dc.contributor.author |
Ibrahim, AbdalbagiAlelaishDafallah |
|
dc.contributor.author |
HmdAlneel, Ahmed Abdul-Jabbar |
|
dc.contributor.author |
Abdullah, Mohammed abdelrasoul |
|
dc.contributor.author |
alfadol, MohannedAbdullahalbasheer |
|
dc.contributor.author |
Supervisor - Sami Mohammed Alameen |
|
dc.contributor.author |
Supervisor - Sami Mohammed Alameen |
|
dc.date.accessioned |
2015-11-16T08:24:45Z |
|
dc.date.available |
2015-11-16T08:24:45Z |
|
dc.date.issued |
2015-10-05 |
|
dc.identifier.citation |
Ibrahim,AbdalbagiAlelaishDafallah.Calculations of optimum injection point for gaslift system/AbdalbagiAlelaishDafallah Ibrahim...{etal};Sami Mohammed Alameen.-khartoum:Sudan University of Science and Technology,College of petroleum engineering and technology,2015.-57p.:ill;28cm.-Bachelors search. |
en_US |
dc.identifier.uri |
http://repository.sustech.edu/handle/123456789/11895 |
|
dc.description |
Bachelors search |
en_US |
dc.description.abstract |
In this project the gas lift system was applied on well (x) Block 6- Sudan by using the volumetric balanced method and by using pipe simulator, The optimum injection point was has been calculated and it was (3600ft) by volumetric balance method and (4183 ft) by simulator software.
|
en_US |
dc.description.sponsorship |
Sudan University of Science and Technology |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
Sudan University of Science and Technology |
en_US |
dc.subject |
point for gaslift |
en_US |
dc.subject |
optimum injection |
en_US |
dc.title |
Calculations of optimum injection point for gaslift system |
en_US |
dc.title.alternative |
حسابات نقطة الحقن المثلى لنظام الرفع بالغاز |
en_US |
dc.type |
Thesis |
en_US |