Please use this identifier to cite or link to this item:
https://repository.sustech.edu/handle/123456789/11895
Title: | Calculations of optimum injection point for gaslift system |
Other Titles: | حسابات نقطة الحقن المثلى لنظام الرفع بالغاز |
Authors: | Ibrahim, AbdalbagiAlelaishDafallah HmdAlneel, Ahmed Abdul-Jabbar Abdullah, Mohammed abdelrasoul alfadol, MohannedAbdullahalbasheer Supervisor - Sami Mohammed Alameen Supervisor - Sami Mohammed Alameen |
Keywords: | point for gaslift optimum injection |
Issue Date: | 5-Oct-2015 |
Publisher: | Sudan University of Science and Technology |
Citation: | Ibrahim,AbdalbagiAlelaishDafallah.Calculations of optimum injection point for gaslift system/AbdalbagiAlelaishDafallah Ibrahim...{etal};Sami Mohammed Alameen.-khartoum:Sudan University of Science and Technology,College of petroleum engineering and technology,2015.-57p.:ill;28cm.-Bachelors search. |
Abstract: | In this project the gas lift system was applied on well (x) Block 6- Sudan by using the volumetric balanced method and by using pipe simulator, The optimum injection point was has been calculated and it was (3600ft) by volumetric balance method and (4183 ft) by simulator software. |
Description: | Bachelors search |
URI: | http://repository.sustech.edu/handle/123456789/11895 |
Appears in Collections: | Bachelor of Petroleum Engineering & Technology |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Calculations of optimum ....pdf | Research | 3.47 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.