Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/11895
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIbrahim, AbdalbagiAlelaishDafallah
dc.contributor.authorHmdAlneel, Ahmed Abdul-Jabbar
dc.contributor.authorAbdullah, Mohammed abdelrasoul
dc.contributor.authoralfadol, MohannedAbdullahalbasheer
dc.contributor.authorSupervisor - Sami Mohammed Alameen
dc.contributor.authorSupervisor - Sami Mohammed Alameen
dc.date.accessioned2015-11-16T08:24:45Z
dc.date.available2015-11-16T08:24:45Z
dc.date.issued2015-10-05
dc.identifier.citationIbrahim,AbdalbagiAlelaishDafallah.Calculations of optimum injection point for gaslift system/AbdalbagiAlelaishDafallah Ibrahim...{etal};Sami Mohammed Alameen.-khartoum:Sudan University of Science and Technology,College of petroleum engineering and technology,2015.-57p.:ill;28cm.-Bachelors search.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/11895
dc.descriptionBachelors searchen_US
dc.description.abstractIn this project the gas lift system was applied on well (x) Block 6- Sudan by using the volumetric balanced method and by using pipe simulator, The optimum injection point was has been calculated and it was (3600ft) by volumetric balance method and (4183 ft) by simulator software.  en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectpoint for gasliften_US
dc.subjectoptimum injectionen_US
dc.titleCalculations of optimum injection point for gaslift systemen_US
dc.title.alternativeحسابات نقطة الحقن المثلى لنظام الرفع بالغازen_US
dc.typeThesisen_US
Appears in Collections:Bachelor of Petroleum Engineering & Technology

Files in This Item:
File Description SizeFormat 
Calculations of optimum ....pdfResearch3.47 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.