Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/11188
Title: APPRAISAL OF EXISTING RIVER PROTECTION WORKS IN THE VICINITY OF KASSALA TOWN
Other Titles: تقويم أعمال الحماية الحالية من النهر بجوار مدينة كسلا
Authors: Mohamed, Adam Khalifa
Supervisor, - Abbas Abd Alla Ibrahin
Co - Supervisor, - Elsaddig Elhady Elhassan
Keywords: Resource Engineering
Protection work
Business calendar
Issue Date: 10-Jan-2013
Publisher: Sudan University of Science and Technology
Citation: Mohamed ,Adam Khalifa .APPRAISAL OF EXISTING RIVER PROTECTION WORKS IN THE VICINITY OF KASSALA TOWN /Adam Khalifa Mohamed ; Abbas Abd Alla Ibrahin.-khartoum:Sudan University of Science and Technology ,College of Water Resource Engineering ,2013 .-162p. :ill. ;28cm .-M.Sc.
Abstract: Study of the Gash River revealed that it is an ephemeral braided unpredictable river. The flood of 2003 caused damages of extensive losses including lives, properties, resulting in an estimated loss of 575 million U.S.Dollars. .Kassala Town lies in the beginning of the Gash River Delta on its eastern bank.Kassala is historically known to be an important agricultural and commercial centre was the capital of the Eastern Region, then it became the capital of Kassala State. The length of the Gash River in the vicinity of Kassala Town under study is 9 kilometers upstream and 9 kilometers downstream Kassala bridges. The study includes consideration of the bridges and their effect on the river morphology and hydrology. The main objective is the appraisal examination of the existing protection and training structure, as well as checking and quantifying the sediment transported into the Gash River to the channel and the delta. Data collected and analysis revealed that the Gash River transports 15 million tons (40 million cubic meters) of sediment annually passing downstream Kassala bridges to its delta. The appraisal revealed that although the adopted spur and dike system was and still is the ideal approach to train the Gash River and protect Kassala Town, yet the conducted undesired activities in its flood plain guide banks and bed were the main causes of inundation of KassalaTown.A second technical reason but not less important than the undesired activities is the absence of maintenance to the existing heads and shanks of the spurs. It was clearly observed during the period from 1975 to 1984, when undesired activities were not practiced the bed of the Gash River in the vicinity of Kassala Town was 10 centimeter below the general ground level of Kassala Town. After 1984 the undesired activities became great. Cross cutting of the spur shanks was conducted in almost all the spur shanks upstream and downstream the bridges. The cross sectional distance between the heads of the spurs heads restricted by design to be only 120 meters became much more than double the distance and in some cases three as much. Bore wells are dug directly with the guide banks outer toe which should have been according to design restriction more than 20 meters. Due to these reasons it was observed that the bed of the Gash River became 2 meter higher than the Kassala town ground level. Hence the two bridges became like a bottle neck obstructing the flow. It is therefore concluded and recommended to enforce a law prohibiting these undesired activities as well as maintaining and rehabilitation of the existing spur dike system. This will only and only be the paved road leading to the protection of Kassala Town and Training the Gash River.
Description: Thesis
URI: http://repository.sustech.edu/handle/123456789/11188
Appears in Collections:Masters Dissertations :Water & Environmental Engineering

Files in This Item:
File Description SizeFormat 
APPRAISAL OF EXISTING ...pdfTitle181.8 kBAdobe PDFView/Open
ABSTRACT.pdfAbstract387.97 kBAdobe PDFView/Open
CHAPTER ONE.pdf
  Restricted Access
chapter21.65 MBAdobe PDFView/Open Request a copy
CHAPTER THREE.pdf
  Restricted Access
chapter2.31 MBAdobe PDFView/Open Request a copy
CHAPTER FOUR.pdf
  Restricted Access
chapter1.08 MBAdobe PDFView/Open Request a copy
CHAPTER FIVE.pdf
  Restricted Access
chapter4.22 MBAdobe PDFView/Open Request a copy
CHAPTER SIX.pdf
  Restricted Access
chapter193.42 kBAdobe PDFView/Open Request a copy
Appendices.pdfAppendix1.1 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.