SUST Repository

A New Heuristic for Scheduling Optimization of Non-Repetitive Construction Projects Under Constrained Resources

Show simple item record

dc.contributor.author Mahmood , Salma Yahia Mohamed
dc.contributor.author Haroun , Ahmed Elamin
dc.contributor.author Loghman ,Adil H. A.
dc.date.accessioned 2017-04-25T07:24:33Z
dc.date.available 2017-04-25T07:24:33Z
dc.date.issued 2015
dc.identifier.citation Mahmood , Salma Yahia Mohamed .A New Heuristic for Scheduling Optimization of Non-Repetitive Construction Projects Under Constrained Resources \ Salma Yahia Mohamed Mahmood ,. Ahmed Elamin Haroun , Adil H. A. Loghman .- Journal of Engineering and Computer Sciences (ECS) .- vol 16 , no1.- 2015.- article en_US
dc.identifier.issn ISSN 1605-427X
dc.identifier.uri http://repository.sustech.edu/handle/123456789/16607
dc.description article en_US
dc.description.abstract In Sudan, the clients, contractors and consultants (stakeholders) suffer from the elongation of project completion time, especially in the case of limited resources. This problem results in the conflict among them, and hence leads to project delay that consequently influences the overall project cost. To solve this problem, data from ten construction projects executed in Khartoum state and other towns was collected, simulated and analyzed. Primavera software program was used as a simulator tool and sixteen selected heuristics were applied to the ten projects. Statistical and operational research tools combined with the existing heuristics, while considering best common practices in construction industry, were used. Lindo software, as a decision making tool, is then used to find the optimum solution, i.e., finding the minimum time to complete the project under limited resources. The results were then evaluated and, hence, concluded that the optimum solution of the extra needed time at its minimum possible rate to complete the project under limited resources was achieved as a result of implementing the heuristic of “minimum late start time”. This new “selectedd” heuristic optimizes the scheduling time of non-repetitive projects while considering the availability of limited resources. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en_US en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Non-repetitive projects; Limited resources; Scheduling optimization; ;Heuristic. en_US
dc.title A New Heuristic for Scheduling Optimization of Non-Repetitive Construction Projects Under Constrained Resources en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account