Abstract:
Continued growth in the industrial, agricultural and residential sector in the period and the recent stretch transport networks to reach new areas has led to increased consumption of electric makes it necessary to cope with the increase.
This research studies load forecast, generation, transmission, distribution and financial planning. It was chosen in the Sudanese Electricity Transmission Company (SETC), medium power system plan (2018 – 2020) as a case study.
After forecast loads of the above years and find out the stations that have been put excessive possible solutions to meet the expected load growth of the loads and it is real time solutions.