Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/9434
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKARAR, AHMED MOHAMED ALI
dc.contributor.authorSupervisor - Ali Mohammed Hamdan Adam
dc.date.accessioned2014-12-31T05:58:23Z
dc.date.available2014-12-31T05:58:23Z
dc.date.issued2014-04-11
dc.identifier.citationKARAR,AHMED MOHAMED ALI .Aplication Of Combined Exergy And Pinch Analysis For Khartoum North Power Station Phase (2)/AHMED MOHAMED ALI KARAR;Ali Mohammed Hamdan Adam.-kartoum:Sudan University of Science and Technology,College of Engineering,2014.-161p:ill;28cm.-M.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/9434
dc.descriptionThesisen_US
dc.description.abstractIn this research,Khartoum North Power Station Phase (2)has been discussed in accordance with Exergy and Pinch technology analysis.Exergy analysis is introduced and defined as energy quality analysis. Also exergy is work potential of energy. The main parameters of exergy analysis has been considered in this research is exergy, exergydestruction(irreversibilities) and second-law efficiency.As outcomes of exergy analysis discussion, the full power plant performance definition is to specify actual work, irreversibility and second-law efficiency which is founded in KNPSP(2) 60 MW,131.3 MW and 31.4% respectively. Also, the worst components in the plant needs to redesign and re-evaluation are first and second feed water heat exchanger according to exergyanalysis. For efficiency of regenerative feed water heat exchanger, the net workincludes heat exchangers from first to fourth is inefficient and needs to redesign but the other net work includes fifth and sixth heat exchangers is efficient heat exchange network.en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectMechanical Engineeringen_US
dc.subjectJoint analysis of Eixergaen_US
dc.subjectElectricity Khartoum stationen_US
dc.subjectenergy quality analysisen_US
dc.titleAplication Of Combined Exergy And Pinch Analysis For Khartoum North Power Station Phase (2)en_US
dc.title.alternativeتطبيق التحليل المشترك للايكسيرجي والبينش علي محطة كهرباء الخرطوم بحري المرحلة الثانيةen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Aplication Of Combined Exergy And Pinch.pdfsearch4.45 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.