Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/9314
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOmer, Ayman Mjdoub Mhjoub
dc.contributor.authorElamin, Mohamed Elamin Ahmed
dc.contributor.authorFadl alla, - Mohanned Abdalgadir Mohamed
dc.contributor.authorAlhassan, - Omer Elamin Mohamed
dc.contributor.authorSupervisor - Mohamed Ahmed Mohamed Naeem
dc.date.accessioned2014-12-28T09:58:35Z
dc.date.available2014-12-28T09:58:35Z
dc.date.issued2014-09-01
dc.identifier.citationOmer,Ayman Mjdoub Mhjoub.Re-design Intermediate CasingTo Solve Corrosion Problem In Well In Higleeg – Case Study/AymanMjdoubMhjoub Omer ... { etal } ; Mohamed Ahmed Mohamed Naeem.-Khartoum:Sudan University of Science and Technology,College of Petroleum Engineering and Technology,2014.- 43P. : ill. ; 28Cm.-B.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/9314
dc.descriptionB.Sc.en_US
dc.description.abstractThe well casing conceder one of the most important process during drilling and production so that must be designed carefully; there are many problems face the casing, one of this problems is leakage pressure such as that occur in many wells in higleeg oil field in Sudan; In this project a case study has been made in an example of well in higleeg oil field. Where the corrosion occurred in the intermediate casing at depth of (4m) below surface. The old design which set before completion was investigated to know if the problem caused by fail in design or not by using the graphical method; after design calculation revealed that the casing which must be run is J-55 with nominal weight 36 Ibm/ft from depth 0 – 1040m and H-40 with nominal weight 36 Ibm/ft from depth 1040 – 1660m and H-40 with nominal weight 32.3 Ibm/ft from depth 1660 – 2156m; however the casing string which set befor completion was N-80 with nominal weight 47 Ibm/ft this casing is good; so that the fail cannot occur by design; after that recommend to solve the problem by design casing patch to the intermediate casing with ¼ 8 in outside diameter and 4 meter length.en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectPetroleum Engineeringen_US
dc.subjectCasing Patchen_US
dc.subjectGraphical Methoden_US
dc.subjectCasing Conceptsen_US
dc.subjectCasing Corrosion Preventionen_US
dc.subjectCasing Corrosionen_US
dc.titleRe-design Intermediate CasingTo Solve Corrosion Problem In Well In Higleeg – Case Studyen_US
dc.title.alternativeإعادة تصميم عمود البطانة الأوسط لحل مشكلة التآكل في بئر بحقل هجليج دراسة حالهen_US
dc.typeThesisen_US
Appears in Collections:Bachelor of Petroleum Engineering & Technology

Files in This Item:
File Description SizeFormat 
Re-design Intermediate Casing.pdfResearch906.86 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.