Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/8826
Title: Building Information Modeling in Construction Management in Sudan
Other Titles: نمذجة معلومات المباني في إدارة التشييد في السودان
Authors: Elkhalig, Munzir Khalid Gasm
Supervisor - Awad Saad Hassan
Keywords: Civil Engineering
Building Information Modeling
Construction management in Sudan
Issue Date: 10-Aug-2014
Publisher: Sudan University of Science and Technology
Citation: Elkhalig,Munzir Khalid Gasm.Building Information Modeling in Construction Management in Sudan/Munzir Khalid GasmElkhalig;Awad Saad Hassan.-khartoum:Sudan University of Science and Technology,College of Engineering,2014.-66p:ill;28cm.-M.Sc.
Abstract: Construction industry is still basically the same as it was hundreds of years ago, from a set of drawings, a building is erected. For the most part, these drawings are never without errors and omissions, causing many delays, multiple change order items, and late projects completion. Building Information Modeling (BIM) softwarehelped out the designers and architects to design and construct the building digitally before the construction phase can start on site. On other word this simulation gives the project team the opportunity to examine the building and solve any problem. Moreover BIM can enhance productivity in construction, reduce requests for information, eliminate coordination problems, reduce construction time, and improve quality. Understanding that BIM software has to offer and implement into the construction industry can be the next challenge will face the construction sector.The aimof this research is to understand the benefits and obstacles of BIM and to explore the current uses of BIM in Sudanese construction industryand why organization are not fully adopting BIM and also to identify obstacles and challenges that face the implementation of BIM.Hence,this research was conducted through literature review and a questionnaire survey in order to achieve these objectives. Theresearch concludes that BIM is in the early stage of implementation and has many obstacles that could slow down the adoption, such as training, costof implementation,and lack of demands from clients and governments bodies. Also the questionnaires survey showed that some sophisticated software has begun to use widely in Sudanese construction industry such as Revit architecture Revit structure which is consider a great indicator to start adopting BIM. Finallycan be concluded from this research, Sudanese construction industry has great opportunityto adopt and implement BIM in near future. Keywords:Building Information Modeling, Construction industry, Productivity, challenges, Obstacles, Implementation, Cost, Improve.
Description: thesis
URI: http://repository.sustech.edu/handle/123456789/8826
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Building Information Modeling.pdftitle57.98 kBAdobe PDFView/Open
English Abstract.pdfAbstract118.32 kBAdobe PDFView/Open
Arabic Abstract.pdfAbstract84.92 kBAdobe PDFView/Open
Contents.pdfContents113.95 kBAdobe PDFView/Open
List of T and F.pdfList 124.97 kBAdobe PDFView/Open
Research.pdfResearch9.18 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.