Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/7868
Title: USE OF FAST TRACK TASK FORCE FOR PROJECT MANAGEMENT
Other Titles: إستخدام طريقة المسار السريع لأدارة المشاريع
Authors: Eltayeb, Omer Ibrahim Ahmed
Supervisor - Nadir Hasanain
Keywords: Civil Engineering
Construction Management
PROJECT MANAGEMENT
Issue Date: 1-Oct-2010
Publisher: Sudan University of Science and Technology
Citation: Eltayeb,Omer Ibrahim Ahmed .USE OF FAST TRACK TASK FORCE FOR PROJECT MANAGEMENT/Omer Ibrahim Ahmed Eltayeb;Nadir Hasanain.-Kartoum:Sudan University of Science and Technology,College of Engineering,2010.-62P. : ill. ; 28Cm.-M.Sc.
Abstract: The purpose of this research is to find a solution to some problems and obstacles that occur during the project life cycle. Which in turn lead to delays in the project and increase in cost. Some information and facts were obtained from previous experiences in the Greater Nile Petroleum Operating Company, as well as international experiences, which have been relying on the way in which the fast track – task force project management , as well as adopted by the researcher in conducting the case study. The research concluded that it is feasible to use the feasibility of this method in solving problems in project management by reducing the solution period, cost and to maintain quality.
Description: Thesis
URI: http://repository.sustech.edu/handle/123456789/7868
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
USE OF FAST TRACK TASK ...pdftitle31.87 kBAdobe PDFView/Open
ABSTRACT.pdfABSTRACT72.1 kBAdobe PDFView/Open
Research.pdf
  Restricted Access
Research242.31 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.