Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/7783
Title: DESIGN OF POWER BUDGET AND RISE TIME CALCULATOR FOR OPTICAL FIBER LINK
Authors: Shiekhedrees, Ibrahim Mohamed toum
Supervisor - Fakher Eldin Mohamed Suliman
Keywords: communication
DESIGN- POWER BUDGET
CALCULATOR FOR OPTICAL
FIBER LINK
Issue Date: 10-Oct-2008
Publisher: Sudan University of Science and Technology
Citation: Shiekhedrees, Ibrahim Mohamed toum . DESIGN OF POWER BUDGET AND RISE TIME CALCULATOR FOR OPTICAL FIBER LINK: A thesis submitted in partial fulfillment of the requirements for the degree of M.Sc. in communication engineering/ Ibrahim Mohamedtoum Shiekhedrees;Fakher Eldin Mohamed Suliman.-khartoum:Sudan University of Science and Technology,College of Engineering,2008.-80p:ill;28cm.-M.Sc.
Abstract: The power and rise time budgets are two important approaches in designing fiber optic links. The power budget approach must take into the consideration the power levels across the link. In the rise time approach, the system designer must take into account the temporal response of the system components. In this research a fiber optic link calculator was designed using visual basic 6.0. The calculator was designed to be user friendly and to fulfill all requirements of both approaches. An executable file was made to run the calculator in all computers under all windows operating system that have DLL libraries which comes with the visual basic.
Description: thesis
URI: http://repository.sustech.edu/handle/123456789/7783
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
DESIGN OF POWER BUDGET.pdftitle109.92 kBAdobe PDFView/Open
Resarch.pdf
  Restricted Access
Resarch722.87 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.