Title: Problems of voltage rise in new Commissioned High voltage 220kv singa -kassala Transmission line
Other Titles: مشكلات ارتفاع الجهد الرابط بالخط الجديد220 بين سنجة وكسلا
Authors: Alnor, Bdar Eldin Ali Adam
Supervisor - Khamis Arbeesh Sadeldeen
Keywords: voltage rise in newCommissioned
PROBLEMS
singa- kassala
Issue Date: 1-Feb-2013
Publisher: Sudan University of Science &Technology
Citation: Alnor,Bdar Eldin Ali Adam .Problems of voltage rise in new Commissioned High voltage 220kv singa -kassala Transmission line/Bdar Eldin Ali Adam Alnor;Khamis Arbeesh Sadeldeen.-Khartoum :Sudan University Of Science And Technology,College of Engineering,2013 .-105P:ill;28Cm.-M.Sc.
Abstract: The new high voltage 220kv transmission line which Originates from singa substation to kassala new substation – is considered as long transmission line of length 391.9 km. It is commissioned to improve the electrical reliability in Eastern grid. But unfortunately there appeared a problem of voltage rise in the line . the aim of this thesis Is to investigate and suggest solutions to the voltage rise problem so as to keep the voltage within standard limits. The data is collected from Sudanese Electricity transmission line Company (SETC) , and analyzed by using MATLAB program A static var compensation (SVC) is suggested for the solution of this problem . Finally a conclusion and recommendation is made.
Description: Thesis
URI: http://repository.sustech.edu/handle/123456789/7702
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Problems of voltage rise ...pdftitle174.26 kBAdobe PDFView/Open
A BSTRACT.pdfA BSTRACT78.19 kBAdobe PDFView/Open
RESEARCH.pdf
  Restricted Access
RESEARCH1.73 MBAdobe PDFView/Open Request a copy
Appendix A.pdfAppendix 190.67 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.