Please use this identifier to cite or link to this item:
https://repository.sustech.edu/handle/123456789/4882| Title: | Ranking of Factors Affecting Performance on Construction Projects in Sudan |
| Other Titles: | ترتيب العوامل المؤثرة على الاداء في مشروعات التشيد في السودان |
| Authors: | Abdallah, Makarim Al Akhlak Babiker Karama Supervisor ,- Nadir Mohammed Hasanien |
| Keywords: | Construction Management Construction Projects - Sudan |
| Issue Date: | 1-Aug-2012 |
| Publisher: | Sudan University of Science and Technology |
| Citation: | Abdallah,Makarim Al Akhlak Babiker Karama .Ranking of Factors Affecting Performance on Construction Projects in Sudan/Makarim Al Akhlak Babiker Karama Abdallah; Nadir Mohammed Hasanien.-Khartoum:Sudan University of Science and Technology,College of Engineering,2012.-79p. : ill. ; 28cm.-M.Sc. |
| Abstract: | This study was carried out to rank the factors affecting the performance of contractors in construction projects in Sudan. These factors are considered as performance indicators to measure the performance in construction projects. These indicators can be used for benchmarking purposes, and would be key components for any organization to achieving best practice. The literature in this area of the research was reviewed to identify these factors. Consequently a questionnaire was established as a tool for collecting data from the research population. The questionnaire had distributed to contractors. Results obtained showed that the most important factor affecting performance is the quality of equipment and raw materials, availability of personal with high experience and qualification, review of failures and solving them, material and equipment cost, sequencing of work according to schedule and leadership skills for project manager. The recommendations stipulate that the contractors should have clear mission and vision to formulate, implement and evaluate performance. It is important for construction organizations to identify the weaknesses of performance in order to solve, overcome and evaluate project overtime through project construction in order to enhance and improve time and cost of project performance. |
| Description: | Thesis |
| URI: | http://repository.sustech.edu/handle/123456789/4882 |
| Appears in Collections: | Masters Dissertations : Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Ranking of Factors Affecting ...pdf Restricted Access | search | 1.3 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.