dc.identifier.citationElzaki, ELkalwati Elsharif Elnour . Overheads and their impact on construction cost in Sudan \ ELkalwati Elsharif Elnour Elzaki ; Abdalla Mohammed Awadalla .- Khartoum:Sudan University of Science & Technology,College of Engineering,2020.-262p.:ill.;28cm.-PhDen_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/26664-
dc.descriptionThesisen_US
dc.description.abstractWhen preparing bids of construction projects all direct costs and project overhead costs should be included as line item costs (cost components) in the bid or project’s budget. Overheads percentage (index) should be clearly identified in order to calculate projects cost accurately and precisely. The absence of logical overhead percentage in Sudan is the main reason of this research. Based on the current situation in project costing in Sudan, and the practice for calculating the overhead charges, this study targets to achieve its main objectives including identifying the overhead charges, verifying and calculating the overhead percentage in Sudan. The research is based on analytical methods by using a questionnaire and a case study. A questionnaire has been distributed to 156 construction contracting companies as well as business trade name whereas the case study was submitted to three contractors provided that all these contractors are working in Khartoum state whereas the samples were selected randomly. Statistical analysis has been used for the data analysis by using SPSS. From the questionnaire and the case study analysis shows that the calculated overheads was 30.65% provided that there are many overhead items were not calculated because they are not occurring at the case study. The researcher recommended that more researches should be conducted for finding out overhead index that represents a reference (index or a code) for calculating an exact and accurate project cost.en_US
dc.description.sponsorshipSudan University of Science & Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectEngineeringen_US
dc.subjectCivil Engineeringen_US
dc.subjectOverheads and their impacten_US
dc.subjectconstruction cost in Sudanen_US
dc.titleOverheads and their impact on construction cost in Sudanen_US
dc.title.alternativeالمنصرفات غير المباشرة وأثرها على تكلفة التشييد بالسودانen_US
dc.typeThesisen_US
Appears in Collections:PhD theses : Engineering

Files in This Item:
File Description SizeFormat 
Overheads and their ....pdfResearch5.76 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.