Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/17261
Title: Improvement of Speed Governor System for Rosaries Hydropower Plant
Other Titles: تحسين منظومة التحكم فى السرعة لنظام حواكم التربينات فى محطة توليد الروصيرص
Authors: ELHASSAN, MUTAZ MOHAMMED SALIH
Supervisor,- ELHADI BADAWI MAHGOUB
Keywords: Mechanical Engineering
Rosaries Hydropower Plant
Speed Governor System
Issue Date: 10-Jan-2016
Publisher: Sudan University of Science and Technology
Citation: ELHASSAN, MUTAZ MOHAMMED SALIH . Improvement of Speed Governor System for Rosaries Hydropower Plant / MUTAZ MOHAMMED SALIH ELHASSAN ; ELHADI BADAWI MAHGOUB .- Khartoum: Sudan University of Science and Technology, college of Engineering, 2016 .- 57p. :ill. 28cm .- M.Sc.
Abstract: Rosaries Hydro-PowerStation considered one of the primary (essential) sources for electric energy inSudan using digital governor, which increases production efficiency compare to the mechanical governors been used before.This study analyzed the hydraulic turbine, identified deficiencies from leakage oil from the pumps used, find out the amount of energy consumed, and work on reducing that by counting the loss through monitoring the poor process during period of maximum water load that exceed up to 85% . ASa result of the study it was that found theamount of the energy consumed been reduced by(48 to 63%). Also reduction of the leakage of the oil in all units by using well-made efficient pumps for each unit according to its consumption.
Description: Thesis
URI: http://repository.sustech.edu/handle/123456789/17261
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Research.pdfResearch1.99 MBAdobe PDFView/Open
Improvement of Speed......pdfTitle&Abstract261.62 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.