Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/16050
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMohammed, Ahmed Hussein Elshareef
dc.contributor.authorSupervisor,- Elsadig Alhadi Elassans
dc.date.accessioned2017-04-10T10:02:12Z
dc.date.available2017-04-10T10:02:12Z
dc.date.issued2016-12-10
dc.identifier.citationMohammed, Ahmed Hussein Elshareef . Risk Management construction Industry From contractors perspective in Khartoum state / Ahmed Hussein Elshareef Mohammed ; Elsadig Alhadi Elassans .- Khartoum: Sudan University of Science and Technology, college of Engineering, 2016 .- 76p .:ill ;28cm .- M.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/16050
dc.descriptionThesisen_US
dc.description.abstractThis research use the theoretical background from the literature review and a “five” pages questionnaire to achieve the research objective. The study result shows that although the contractors personal have agood knowlage about R.M but there is no separate division for R.M in 96% of their companies also there is no systematic practice of R.M . The study finding shows that the most important risk factors are: Force majour ,The poor tender evaluation ,The not competent contractor team ,The lack of experience and competent of consultant team in the site ,The new governmental legislation,Payment delay ,Error in the design ,Contract assignment to inappropriate contractor by inaproprate contract type And The contractor bankruptcy .. Also the study finds that the contracting companies still use atraditional methods to response to risks the most effective methods use by the contracting companies to prevent the risks are Depend on subjective judgment and experience to produce perfect program ,Put a time buffer in the construction program ,Plan to an alternative constructin program and Refer to previous project historical data to produce realistic program . From the result the study recommend that : 1- Contracting company has to give more ttention to risk management and must hire RM specialist or have separate RM division 2- The government must change the tendering proceduer and contracting method to help industry to develop . 3- Contacting company have to use the quantitive method to determine the time schedule for its projecten_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectRisk Management constructionen_US
dc.subjectcontractors perspectiveen_US
dc.titleRisk Management construction Industry From contractors perspective in Khartoum stateen_US
dc.title.alternativeادارة المخاطر في صناعة التشييد من منظور المقاولين في ولاية الخرطومen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Risk Management construction ....pdfTitle59.48 kBAdobe PDFView/Open
ABSTRACT.pdfAbstract135.31 kBAdobe PDFView/Open
Research.pdfResearch1.22 MBAdobe PDFView/Open
Appendix.pdfAppendix127.79 kBAdobe PDFView/Open
Appendix 2.pdfAppendix153.35 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.