https://repository.sustech.edu/handle/123456789/13016| Title: | THE PROCESS OF PLANNING& SCHEDULING IN CONSTRUCTION PROJECTS IN SUDAN Towards optimum applications |
| Other Titles: | عملية التخطيط والجدولة في مشروعات التشييد بالسودان نحو التطبيقات المثلى |
| Authors: | DOLEEB, SAHAR MOAWYA MOHAMMED Supervisor -, Salah eldain Abdul-Aziz Ajban |
| Keywords: | CONSTRUCTION MANAGEMENT Civil Engineering Construction projects in Sudan |
| Issue Date: | 10-Jan-2016 |
| Publisher: | Sudan University of Science and Technology |
| Citation: | DOLEEB , SAHAR MOAWYA MOHAMMED . THE PROCESS OF PLANNING& SCHEDULING IN CONSTRUCTION PROJECTS IN SUDAN Towards optimum applications / SAHAR MOAWYA MOHAMMED DOLEEB ; Salah eldain Abdul-Aziz Ajban .- Khartoum: Sudan University of Science and Technology, College of Engineering,2016 .-128p .:ill. ;28cm .-M.Sc. |
| Abstract: | The primary objective of this research is scientific knowledge to the process of planning, scheduling and their application in construction projects in Sudan and see the obstacles impeding the implementation of this concept and know how to scientific planning and sound the ability to apply it and work done in a satisfactory manner. Attention to planning and scheduling in construction industry project in Sudan requires attention to projects achievement in scientific and study methods, that must be from the start to form a preliminary idea and point and acknowledge all factors effect to the project performance and putting a clear picture for implementation and ability of controlling and monitoring of the execution based on planned time table designed by planned engineer s/he put all factors effect to project such as time factor as a key factor as well as quality and cost, resource utilization effectiveness. During the execution generate the updating time table and resource leveling and preparing budget to best uses of available resources. The research aims to highlight the potential for the massive planning process and scheduling of construction projects in terms of take advantage of all resources available to complete work image pathological all parties and the advancement of this industry in our beloved country and develop an understanding of the engineer to further job performed in any field and know that any project is the work of a collective because team work and mutual understanding leads to better result in addition to out of the circle that the time program is only in the bidding stage in many companies it is just to see the beginning and end of project and the lack of studies as required. |
| Description: | Thesis |
| URI: | http://repository.sustech.edu/handle/123456789/13016 |
| Appears in Collections: | Masters Dissertations : Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| THE PROCESS OF PLANNING....pdf | Research | 1.22 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.