Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/12635
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKhalid, Abdullahi Mohammed Ali-
dc.contributor.authorElhussain, Amjed Ibrahim Osman-
dc.contributor.authorHamdoon, Eltayeb Hamdoon Eltayeb-
dc.contributor.authorSharaf Eldin, Mutasim Gadallah Ahmed-
dc.date.accessioned2016-02-03T10:35:09Z-
dc.date.available2016-02-03T10:35:09Z-
dc.date.issued2015-10-01-
dc.identifier.citationKhalid,Abdullahi Mohammed Ali.Auto-Restart Circuit for Variable Speed Drive by Using Smart Relay in Petroleum Wellheads/ Abdullahi Mohammed Ali Khalid...{etal} ; Galal Abdulrahman Mohammed.-khartoum:Sudan University of Sciences and Technology,College of Engineering,2015.-77p:ill;28cm .-Bachelors search .en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/12635-
dc.descriptionBachelors searchen_US
dc.description.abstractAuto Restart Circuit solved the sudden start of the motor which cause the breakage of the shaft which connect the motor to the pump due the reversal rotation of the shaft, and will also solve the time loss caused by the operator (if we consider that there was an operator who operate and perform the restart of the pump) because the wellhead is far away from central process facility. Here comes the smart relay part to solve the above problems we need to set the smart relay to start the pump after specific time ( when reverse rotation stop ) , so by connecting smart relay with the Variable Speed Drive (VSD) to perform the auto restart operation we will cause a reduction in the errorsen_US
dc.description.sponsorshipSudan University of Sciences & Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Sciences and Technologyen_US
dc.subjectPetroleum Wellheadsen_US
dc.subjectCircuit for Variable Speed Driveen_US
dc.subjectRelay in Petroleum Wellheadsen_US
dc.titleAuto-Restart Circuit for Variable Speed Drive by Using Smart Relay in Petroleum Wellheadsen_US
dc.title.alternativeدائره اعاده التشغيل لسواقه متغير السرعه باستخدام المرحل الذكى فى ابار البترولen_US
dc.typeThesisen_US
Appears in Collections:Bachelor of Engineering

Files in This Item:
File Description SizeFormat 
Auto Restart Circuit For VSD Using Smart Relay In Petrolum Wellheads.pdfsearch1.49 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.