Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/11772
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSalih, AlrsheedMohammed Suliman
dc.contributor.authorSupervisor - ElsadegElhadi ElHassan
dc.date.accessioned2015-11-05T10:43:37Z
dc.date.available2015-11-05T10:43:37Z
dc.date.issued2015-08-10
dc.identifier.citationSalih ,AlrsheedMohammed Suliman. RISK MANAGEMENT OF CONSTRUCTION PROJECTS IN KHARTOUM STATE /AlrsheedMohammed SulimanSalih ;ElsadegElhadi ElHassan .-khartoum :Sudan University of Science and Technology,College of Engineering ,2015 .-88p. :ill. ;28cm .-M.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/11772
dc.descriptionThesisen_US
dc.description.abstractThe construction projects of a special nature and the most important features the length of time that may lead to changed circumstances making it contains multiple risk as a result of the length of the implementation period and multiple stages, starting from the inception phase through implementation to final handing, which leads to increased conditions and uncertainty and increase the probability of the occurrence of risk , including a negative impact on contracting economics of building and construction. Objectives of this study is to determine the risks that cause the parties of project in occurrence and effective ways to manage these risks in the framework of cooperation between the parties to the project. Deduced research of theoretical and field study represented in the questionnaire that engineers and contractors in companies and institutions (in the scope of the study limits) do not have the experience and knowledge of scientific sufficient to application and use of risk management tools addition material cost required to use these tools, which may reach 10% of the project cost management. The research concluded that the most appropriate policy to meet the risks are pre-planned in the same idea stage and not rely on unpredictable and wished good luck but planned at the hands of a specialist in risk management or of his high experience in this field and so we can calculate the ratio of the risk of failure of the project and thus the possibility of to give it up before incurring losses. All of these reasons led to the outcome of many of the recommendations that illustrate there significant benefit to be derived from observance the application of risk management tools by continued cooperation between the parties of the project.en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectCivil Engineeringen_US
dc.subjectRisk Managementen_US
dc.subjectConstruction Projecten_US
dc.titleRISK MANAGEMENT OF CONSTRUCTION PROJECTS IN KHARTOUM STATEen_US
dc.title.alternativeإدارة المخاطر في مشروعات التشييد بولاية الخرطومen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Supplementary research for ...pdfTitle409.18 kBAdobe PDFView/Open
ABSTRACT.pdfAbstract560.65 kBAdobe PDFView/Open
chapter one.pdfchapter300.36 kBAdobe PDFView/Open
chapter tow.pdfchapter737.42 kBAdobe PDFView/Open
chapter three.pdfchapter469.3 kBAdobe PDFView/Open
chapter four.pdfchapter1.85 MBAdobe PDFView/Open
chapter five.pdfchapter444.96 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.