Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/10878
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRida, Mutaz Zaher Mebrahto
dc.contributor.authorSupervisor - Awad Saad Hassan
dc.date.accessioned2015-05-06T12:40:16Z
dc.date.available2015-05-06T12:40:16Z
dc.date.issued2015-03-01
dc.identifier.citationRida,Mutaz Zaher Mebrahto.FACTORS INFLUENCING CONSTRUCTION PROJECTS PERFORMANCE IN SUDAN/Mutaz Zaher Mebrahto Rida;Awad Saad Hassan .-Khartoum:Sudan University of Science and Technology,engineering,2015.-89P. : ill. 28Cm.-M.SC.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/10878
dc.descriptionThesisen_US
dc.description.abstractConstruction industry has complexity in its nature because it contains large number of parties as clients, contractors, consultants, stakeholders and others. Construction projects suffer from many problems and complex issues in performance such as cost, time and safety. The aim of this thesis is to identify and evaluate the main factors affecting the performance of construction projects .Literature review about performance was reviewed to identify the factors affecting the performance of construction projects. A questionnaire survey was conducted and 34 factors were identified, categorized into 7 groups, evaluated and ranked from consultants and contractors perspectives. Questionnaires were distributed as follows: 20 to consultants and 40 to contractors. The results were analyzed, discussed to obtain the most performance indicators. The relative importance index method (RII) was used here to determine consultants and contractors perceptions of the relative importance of the performance indicators in construction projects. The most important factors agreed by contractors were: Leadership skills for project manager was the most important performance factor, Availability of personals with high experience and qualification, Availability of resources as planned through project duration, Learning from best practice and experience of others, Quality of equipment and raw materials in project, Average delay in payment from owner to contractor and Sequencing of work according to schedule. All these factors were represented the top significant factors affecting the performance of the construction projects according to the contractor’s views. The most important factors agreed by consultants were: the Conformance to specification, Availability of personals with high experience and qualification, Sequencing of work according to schedule, Liquidity of organization, learning from best practice and experience of others, Quality of equipment and raw materials in project. This factors were represented the top significant affecting the performance of the construction projects according to the consultants views. Recommendations were formulated to improve performance of construction projects. It was concluded that consultants and contractors agree that actual cost of executed projects was more than the estimated cost because of changing which can be happening especially in economic conditions and situation. The project sometimes delays by late payment from the owner and Contractors usually suffer from this problem, it also concluded that most of contractors do not care with applying health and safety factors during construction of projects and also there is shortage in formal safety training. In addition, consultants do not have sufficient control or continuous supervision for safety application. All of that will lead to occurrence of accidents and problems in construction projects. The study recommended developing human resources in the construction industry through proper and continuous training programs about construction projects performance. It is necessary for construction organizations to evaluate the liquidity before implementation of any construction project because of difficult economic situation. All of that will assist organizations to perform projects successfully and strongly.en_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectCivil Engineeringen_US
dc.subjectConstruction Managementen_US
dc.subjectConstruction industryen_US
dc.titleFACTORS INFLUENCING CONSTRUCTION PROJECTS PERFORMANCE IN SUDANen_US
dc.title.alternativeالعوامل المؤثرة في أداء مشاريـع التشييــد في الســــودانen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
FACTORS INFLUENCING CONSTRUCTION ....pdfResearch449.08 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.