SUST Repository

Optimization of physical assets maintenance using terotechnology : A Case Study of Sea Ports Corporation, dockyard work shop

Show simple item record

dc.contributor.author Eltom, Elhussien Mohamed
dc.contributor.author Supervisor - Elkhawad Ali Elfaki
dc.date.accessioned 2014-11-25T10:05:07Z
dc.date.available 2014-11-25T10:05:07Z
dc.date.issued 2010-10-01
dc.identifier.citation Eltom,Elhussien Mohamed.Optimization of physical assets maintenance using terotechnology : A Case Study of Sea Ports Corporation, dockyard work shop/Elhussien Mohamed Eltom;Elkhawad Ali Elfaki.-Kartoum:Sudan University of Science and Technology,College of Engineering,2010.-93P. : ill. ; 28Cm.-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/8231
dc.description Thesis en_US
dc.description.abstract Maintenance should be economized, and to do that we should look at it from a terotechnological point of view, all its practices (Engineering, management and financial) , from asset specification up to its disposal or replacement interact to pursuit its economic life cost, using necessary tools to develop maintenance procedures. This study is directed mainly towards use of terotechnology techniques for sea ports corporation dockyard workshop physical assets maintenance optimization. Microsoft office Accesses (xp) soft ware program for system information. Primavera project planner (p3) soft ware program for project planning and managing. Statistic and reliability theory for asset performance measurement. Root cause analysis for fault diagnoses and optimize machine utilization. Microsoft office excel program for replacement analysis. The application of terotechnology concept in assets maintenance, total life time cost is minimized. Ultimately through application of terotechnology tools we achieve:- 1) Good planning and controlling for the project. 2) Optimum utilization of resources. 3) More information for decision making. (See reports attached.) 4) Information provided can provide a basis for forming long-term plans. 5) Improved in availability system. 6) High product quality. 7) Improve in system efficiency and effectiveness. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Mechanical Engineering en_US
dc.subject physical assets maintenance en_US
dc.subject terotechnology en_US
dc.subject Sea Ports Corporation, dockyard work shop en_US
dc.subject maintenance en_US
dc.title Optimization of physical assets maintenance using terotechnology : A Case Study of Sea Ports Corporation, dockyard work shop en_US
dc.title.alternative ترشيد الصيانة للأصول باستخدام التروتكنولوجى : دراسة حاله ورشه الحوض بهيئة المواني البحرية en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search SUST


Browse

My Account