SUST Repository

REHABILITATION AND UPGRADING OF KHARTOUM NORTH POTABLE WATER PLANT

Show simple item record

dc.contributor.author Ahmed, Abbas Mergni Eljack M.
dc.contributor.author Supervisor ,- Mohammed Ahmed Adam Khadam
dc.date.accessioned 2014-05-04T11:42:13Z
dc.date.available 2014-05-04T11:42:13Z
dc.date.issued 2013-05-01
dc.identifier.citation Ahmed,Abbas Mergni Eljack M. .REHABILITATION AND UPGRADING OF KHARTOUM NORTH POTABLE WATER PLANT/Abbas Mergni Eljack M. Ahmed;Mohammed Ahmed Adam Khadam.-Khartoum:Sudan University of Science and Technology,College of Engineering,2013.-40p. : ill. ; 28cm.-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/4757
dc.description Thesis en_US
dc.description.abstract Potable water is a necessity for all domestic uses in Khartoum State and the entire world. There are many treatment plants for surface water from river NILE and its tributary. Khartoum North (BAHRI) water treatment station is the largest treatment plant and is selected for this study. There is water deficit in Khartoum State as a result of increased population in the state. Bahri water treatment plant was selected for rehabilitation to increase water productivity for the residence of Khartoum State. Rehabilitation of Khartoum North Treatment Plant includes installation of new water pumps, new feeding water pipes and construction of a flash mixer. Clarifiers were improved in performance by installing lamella. For rapid sand filters the media was changed and new nozzles were installed to increase the rate of filtration. New lifting station with (six) pumps to pumped extra (100,000m3/day) of treated water were erected. New equipments were added to the laboratory with line water quality measurement instruments. The landscape of the treatment plant was improved significantly. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject CONSTRUCTION MANAGEMENT en_US
dc.subject Potable water en_US
dc.subject KHARTOUM NORTH POTABLE WATER PLANT en_US
dc.title REHABILITATION AND UPGRADING OF KHARTOUM NORTH POTABLE WATER PLANT en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search SUST


Browse

My Account