SUST Repository

Study of performance of Boiler in Garri 4 Power Plant

Show simple item record

dc.contributor.author Ahmed, Hanadi Hisham Hassan
dc.contributor.author Supervisor ,- Saber Mohamed Salih
dc.date.accessioned 2013-10-07T07:34:04Z
dc.date.available 2013-10-07T07:34:04Z
dc.date.issued 2012-07-04
dc.identifier.citation Ahmed, Hanadi Hisham Hassan. Study of performance of Boiler in Garri 4 Power Plant: Hanadi Hisham Hassan Ahmed; Saber Mohamed Salih: Khartoum :Sudan University of Science & Technology, College of Engineering, 2012. - 49p. : ill. ; 28cm. - M.S.c. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/1886
dc.description Thesis en_US
dc.description.abstract In Sudan, demand for electric power continues to increase rapidly due to the increase of the population growth, economic, industrial development, and progressive replacement of exchange technology with clean forms of energy generation. Atmospheric circulating fluidized bed (CFB) technology has emerged as an environmentally suitable technology for burning an extensive range of solid fuels to produce steam and electricity power. Since 20 years CFB is considered to be a wide technology with more than 400 CFB boilers in operation worldwide, ranging from 5 MW to 250 MW. The National Electricity Corporation of Sudan (NEC) has selected a technology that will operate an extensive range of low-cost solid fuels, decrease emissions, decrease life cycle costs, and provide consistent steam generation for electric power generation. Therefore, CFB is often the preferred technology. In this thesis was study the performance of CFB boiler in Garri 4 power plant and calculated of efficiency using the indirect method, through the difference between the percentage of input energy and percentage of heat losses. In addition has been defined and described units in the boiler. Also explain the methods of measurement and test preparation. Finally efficiency of CFB boiler was calculated according to the American Society of Mechanical Engineers and the result of efficiency was 91.45%. According to the guarantee value of boiler efficiency in Garri 4 power plant is 90.06% that means that the result is reasonable. en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science & Technology en_US
dc.subject Boiler en_US
dc.title Study of performance of Boiler in Garri 4 Power Plant en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search SUST


Browse

My Account