SUST Repository

Uprating of Hydropower Plants : Case Study Rosaries and Algerba Hydropower Station

Show simple item record

dc.contributor.author Ahmed, Mohammed Abdulla
dc.contributor.author Supervisor - Sabir Mohammed Salih
dc.date.accessioned 2014-11-12T06:37:07Z
dc.date.available 2014-11-12T06:37:07Z
dc.date.issued 2006-11-01
dc.identifier.citation Ahmed,Mohammed Abdulla .Uprating of Hydropower Plants : Case Study Rosaries and Algerba Hydropower Station/Mohammed Abdulla Ahmed;Sabir Mohammed Salih.-Khartoum:Sudan University of Science and Technology,College of Engineering,2006.-63P. : ill. : 28Cm.-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/7960
dc.description Thesis en_US
dc.description.abstract Rosaries and Algerba Hydropower Plants were done respectively. This study shows briefly the technical data of both plants, it also describes the steps and procedures of the uprating ,and discusses the results of uprating according to the contract with National Electrity Corporation and according to the Standard Regulations and Modernization methods that have been applied in different projects in the world. The study shows different equations and procedures, and compares the results with that done in the hydropower plant in the Sudan, also the total cost of uprating compared with similar units in different projects. Finally it is believed that the uprating done in the both plants did not lead to improve the efficieny according to international standards , but uprating done in Rosaries Hydropower plant is more effective than that in the other plant because of low cost , improvement in efficiency , with only increased discharge ( no change in other parameter ). en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject MECHANICAL ENGINEERING en_US
dc.subject Hydropower Station en_US
dc.subject Hydropower Plants en_US
dc.subject Rosaries en_US
dc.subject Algerba en_US
dc.title Uprating of Hydropower Plants : Case Study Rosaries and Algerba Hydropower Station en_US
dc.title.alternative رفع معدل انتاج محطات التوليد المائية en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search SUST


Browse

My Account