SUST Repository

Interconnection of Electrical Engergy Between Neigbouring Countries : Sudan - Ethiopia

Show simple item record

dc.contributor.author Easa, Mohammed AbuZied Musa
dc.contributor.author Supervisor ,- Khamis Arbeesh Saad Eldin
dc.date.accessioned 2014-05-11T07:13:53Z
dc.date.available 2014-05-11T07:13:53Z
dc.date.issued 2012-03-01
dc.identifier.citation Easa,Mohammed AbuZied Musa .Interconnection of Electrical Engergy Between Neigbouring Countries : Sudan - Ethiopia/Mohammed AbuZied Musa Easa;Khamis Arbeesh Saad Eldin.-Khartoum:Sudan University of Science and Technology,College of Engineering,2012.-66p. : ill. ; 28cm.-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/4871
dc.description Thesis en_US
dc.description.abstract The aim of Sudan-Ethiopia electrical power interchange is to make use of the surplus water for hydro-generation in Ethiopia and to reduce the thermal generation in Sudan. In order to achieve this aim mentioned above, it requires that the interconnected transmission line between the two countries should be more stabile and reliable. The transmission interconne The aim of Sudan-Ethiopia electrical power interchange is to make use of the surplus water for hydro-generation in Ethiopia and to reduce the thermal generation in Sudan. In order to achieve this aim mentioned above, it requires that the interconnected transmission line between the two countries should be more stabile and reliable. The transmission interconnection line parameters are calculated by using MATLAB program. By using these parameters the rating of static var compensator (SVC) is found, This can be installed through interconnection transmission line to compensate the receiving end open circuit voltage to the specified level (220 KV) at Gadaref Substation. A mathematical model is made based on this idea, and a computer program is employed, to get the results which are analyzed. Finally, a conclusion is made. The aim of Sudan-Ethiopia electrical power interchange is to make use of the surplus water for hydro-generation in Ethiopia and to reduce the thermal generation in Sudan. In order to achieve this aim mentioned above, it requires that the interconnected transmission line between the two countries should be more stabile and reliable. The transmission interconnection line parameters are calculated by using MATLAB program. By using these parameters the rating of static var compensator (SVC) is found, This can be installed through interconnection transmission line to compensate the receiving end open circuit voltage to the specified level (220 KV) at Gadaref Substation. A mathematical model is made based on this idea, and a computer program is employed, to get the results which are analyzed. Finally, a conclusion is made. ction line parameters are calculated by using MATLAB program. By using these parameters the rating of static var compensator (SVC) is found, This can be installed through interconnection transmission line to compensate the receiving end open circuit voltage to the specified level (220 KV) at Gadaref Substation. A mathematical model is made based on this idea, and a computer program is employed, to get the results which are analyzed. Finally, a conclusion is made. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Electrical Engineering en_US
dc.subject Power en_US
dc.subject Electrical Engergy en_US
dc.subject Sudan-Ethiopia - Electrical Power Interchange en_US
dc.title Interconnection of Electrical Engergy Between Neigbouring Countries : Sudan - Ethiopia en_US
dc.title.alternative ربط الطاقة الكهربائية بين الدول المجاورة : دراسة حالة الربط السودانى الاثيوبى en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search SUST


Browse

My Account