SUST Repository

Causes and Removal Methods of Crude Oil Pipeline Scale Deposition. Case Study of Diffra Oilfield - Sudan

Show simple item record

dc.contributor.author Eltaib, Omer Elgaili
dc.date.accessioned 2014-04-23T13:18:05Z
dc.date.available 2014-04-23T13:18:05Z
dc.date.issued 2011-03-01
dc.identifier.citation Eltaib,Omer Elgaili.Causes and Removal Methods of Crude Oil Pipeline Scale Deposition. Case Study of Diffra Oilfield - Sudan/Omer Elgaili Eltaib;Ali Abdelrahman Rabah.-Khartoum:Sudan University of Science and Technology,Petroluem Engineering and Technology ,2011.-73p. : ill. ; 28cm.-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/4600
dc.description Thesis en_US
dc.description.abstract The deposition of scale on surface and subsurface of production equipment causes a major operation problem. The problem becomes more acute as oil and gas reserve is depleted and water production increases. This work investigated the causes of scale formation on crude oil pipeline. The work also studied the mechanical and chemical scale removal methods. The scaling problem is experienced in some Sudanese oil reservoirs especially Block-04 fields namely Diffra and Neem. Diffra oil field (Muglad basin) is taken as a case study. The study based on well and pipe line historical data of the last three years. The data included well production, well parameters, oil and water qualities and physical inspection of the formed deposits. The study revealed that the main cause of scale formation is the presence of calcium in produced water; it contains a hardness of 20 ppm. The scale contains 78% calcium carbonate, 12 % magnesium carbonate and 10% wax. The rate of deposition increases with the increase of water cut. The study of removal methods indicated that the currently employed chemical removal method is effective; however the down time is high making significant production cut. A method to reduce the cleaning down time is proposed. For the case of uniform pipe cross-section the standard pigging technology is recommended rather than chemical cleaning. For the section of the pipeline where the cross-section is non uniform due to presence of valves, reducers, etc, the chemical cleaning is recommended, however a bypass line is to be installed to reduce the down time. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject PETROLEUM RESERVOIR ENGINEERING en_US
dc.subject Diffra Oilfield - Sudan en_US
dc.subject Oil and Gas Reserve en_US
dc.subject Crude Oil en_US
dc.title Causes and Removal Methods of Crude Oil Pipeline Scale Deposition. Case Study of Diffra Oilfield - Sudan en_US
dc.title.alternative ترسبات خطوط نقل خام البترول : دراسة حالة حقل دفرا- السودان en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account