SUST Repository

Well Control Strategy plan For Block V111 - Dindir - Sudan : ( Case Study )

Show simple item record

dc.contributor.author Mohamed, Shazly Sayed-Ahmed Abdelmajed
dc.date.accessioned 2014-04-23T13:07:39Z
dc.date.available 2014-04-23T13:07:39Z
dc.date.issued 2011-12-01
dc.identifier.citation Mohamed,Shazly Sayed-Ahmed Abdelmajed .Well Control Strategy plan For Block V111 - Dindir - Sudan : ( Case Study )/Shazly Sayed-Ahmed Abdelmajed Mohamed ;Ahmed Abdelaziz Ibrahim.-Khartoum:Sudan University of Science and Technology,Petroluem Engineering and Technology ,2011.-111p. : ill. ; 28cm.-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/4598
dc.description Thesis en_US
dc.description.abstract Well control problems plagued the petroleum industry since it's infancy and known as losses of valuable resources, costs increasing, environmental damages, personnel casualties. The objective of this research is to develop well control strategy for block-8 depending on Twakul- 1 well analysis of control problem occurred. Studying the wire line data for the purpose of determining high pressure regions, that found three of high pressure zones over there. It was then confirmed pressure points data using well test data. A reasonable match between data confirmed the accuracy of data and as reference the wire line data were correlated to the others. Wire line data have been matches with each other justifying normal trend lines exist in subnormal region. Based on pressure analysis resulted balanced and safe mud weights were illustrated. Volumetric stripping method has been applied to kill the well. It is a complex technique combining volumetric method and stripping operation. It is worth mentioning; this method not common in the oil industry and is the first time to be applied in the Sudan. Well control strategy has been developed to help prevent and ease of dealing with such problems in future for Block-8, Dindir – Sudan. This well control strategy include four sections, a section of equipments, a section of alarms, a section of procedures and a section of training at rig site. Finally; it is a future prospective to have Sudanese well control, blowout and fire fighting strategies. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject PETROLEUM ENGINEERING en_US
dc.subject WElls - Planning en_US
dc.subject Block V111 - Dindir - Sudan en_US
dc.subject Petroleum Industry en_US
dc.title Well Control Strategy plan For Block V111 - Dindir - Sudan : ( Case Study ) en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account