SUST Repository

Evaluation of Cost and Time Control using Earned Value in Building Projects in Khartoum State

Show simple item record

dc.contributor.author Farah, Asmaa Mohammed Ahmed
dc.contributor.author Supervisor, - Eltahir Abu Elgassim Mohammed
dc.date.accessioned 2020-03-12T08:48:07Z
dc.date.available 2020-03-12T08:48:07Z
dc.date.issued 2020-01-10
dc.identifier.citation Farah, Asmaa Mohammed Ahmed . Evaluation of Cost and Time Control using Earned Value in Building Projects in Khartoum State / Asmaa Mohammed Ahmed Farah ; Eltahir Abu Elgassim Mohammed .- Khartoum: Sudan University of Science and Technology, college of Engineering, 2020 .- 153p. :ill. ;28cm .- M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/24843
dc.description Thesis en_US
dc.description.abstract In the period between 2016-2019 and the problem of searching for roads lies in the cost and time of projects in the construction experience in Sudan from exceeding the time specified in the contract between the owner and the executing party and exceeding the cost in contracts The research aims to know the cost and time control, monitor the project status and forecast the final work cost, to address weaknesses and defects in the plan and early identification of risks at the beginning of the project. The study hypothesized that there is a relationship between controlling construction projects, namely controlling cost and time, monitoring the project’s status through updating project costs, managing changes to the cost baseline, forecasting the final work cost, dealing with weaknesses and defects in the plan, reducing losses that occur when achieving the desired results. The research followed the descriptive and analytical method A case study was done for the Al-Sajana Commercial Tower project by collecting its data. A questionnaire was designed for workers in construction projects in Khartoum State targeting the engineering engineers registered in the engineering group. The approved number of participants was 110 participants. The research reached several results that demonstrated inflation has a major impact on project resources. The earned value is more used in construction projects in Sudan because it is considered one of the most successful ways to monitor the project and forecast what it will be in the future. The research reached several recommendations, including qualifying the administrative staff for construction projects in Sudan to use cost estimation methods in institutions, developing the role of administrative departments such as planning, follow-up, studies, designs and technical specifications for contracts to facilitate the implementation of projects en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Building Projects en_US
dc.subject civil engineering en_US
dc.subject construction en_US
dc.subject Time Control using Earned en_US
dc.title Evaluation of Cost and Time Control using Earned Value in Building Projects in Khartoum State en_US
dc.title.alternative تقويم التحكم في التكلفة والزمن بإستخدام القيمة المكتسبة في مشاريع البناء في ولاية الخرطوم en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account