SUST Repository

Performance Evaluation of Industrial Waste Water Treatment Plant of White Nile Tannery

Show simple item record

dc.contributor.author Ahmed, Ammar Ahmed Elbager
dc.contributor.author Supervisor, -Dalia Ahmed Mohamed Osman
dc.date.accessioned 2020-03-11T06:59:00Z
dc.date.available 2020-03-11T06:59:00Z
dc.date.issued 2019-10-22
dc.identifier.citation Ahmed, Ammar Ahmed Elbager .Performance Evaluation of Industrial Waste Water Treatment Plant of White Nile Tannery \ Ammar Ahmed Elbager Ahmed ; Dalia Ahmed Mohamed Osman .- Khartoum: Sudan University of Science and Technology, College of Water and Environmental Engineering, 2019 .- 122 p. :ill. ;28cm .- M.Sc en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/24802
dc.description Thesis en_US
dc.description.abstract One of the most hazardous pollutants to the environment is those produced from the industrial activities, and tanneries are one of the sources of the environmental pollution for their production of toxic and carcinogenic wastes such as chromium. The main objective of this study was to assess the performance of the industrial wastewater treatment plant of White Nile tannery. The performance was evaluated in terms of the characteristics of the wastewater disposing in the sewage network after passing through the primary treatment plant, such as biological oxygen demand(BOD) ,chemical oxygen demand(COD),total suspended solid(TSS),total dissolved solid(TDS) ,oil and greases ,PH, and chrome(Cr).the results obtained showed that the minimum concentration of BOD ,COD, TDS and pH after treatment are ( 620 , 1600,5820 mg/l and 7) respectively, these values doesn't meet the requirement of the Sudanese standards for the disposal of industrial wastewater in the sewage network except the TSS, the maximum concentration of TSS it is 340 mg/l . So the high values of BOD and COD after treatment compared with the standard limits indicate that the biological treatment is not efficient, therefore The BOD and COD removal efficiency should be increased by mixing sewage with industrial wastewater to increase the amount of microorganisms, and the duration of treatment should be increased also from 16 hr to 32 hr to reduce concentrations of organic pollutants, but the sedimentation process works efficiently according to TSS values. There is a variation in Cr values, some values meet the requirement of the Sudanese standard and others are higher than the allowable limit, therefore, there is a need for a unit in the treatment plant to recover the chromium (Cr) and reuse of it in the tanning process again. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Water & Environmental Engineering en_US
dc.subject Environmental Engineering en_US
dc.subject Industrial Waste Water Treatment Plant en_US
dc.subject White Nile Tannery en_US
dc.title Performance Evaluation of Industrial Waste Water Treatment Plant of White Nile Tannery en_US
dc.title.alternative تقويم أداء محطة معالجة المياه العادمة بمدبغة النيل الأبيض en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account