Abstract:
This research discusses electrical design of power transmission
substation as solution of increasing of load and entering Al_Sounot
project to grid by large capacity. thesis involves planning done by
analytical method, short circuit, and load flow analysis studies done by
simulation using e-tab program. These studies based on a real data from
national Sudanese electrical companies. As a result of these studies site
was selected, capacity of transformers, number of feeders, rating of
other equipment and devices were determined.