SUST Repository

THERMO-ECONOMIC ANALYSIS OF STEAM PLANTS: CASE STUDY (KHARTOUM NORTH POWER STATION)

Show simple item record

dc.contributor.author Abdelmageed, Alhadi Abdalmageed Mohammed
dc.contributor.author Mustafa, Mohammed Hisham Salama
dc.contributor.author Supervisor-, Abdallah Mokhtar Mohmmed Abdallah
dc.date.accessioned 2018-01-09T08:21:03Z
dc.date.available 2018-01-09T08:21:03Z
dc.date.issued 2017-10-01
dc.identifier.citation Abdelmageed, Alhadi Abdalmageed Mohammed.THERMO-ECONOMIC ANALYSIS OF STEAM PLANTS: CASE STUDY (KHARTOUM NORTH POWER STATION)/Alhadi Abdalmageed Mohammed Abdelmageed,Mohammed Hisham Salama Mustafa;Abdallah Mokhtar Mohmmed Abdallah.-Khartoum : Sudan University of Science and Technology, College of Engineering,2017.-64 p. :ill;28cm.- Bachelors search. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/19875
dc.description Bachelors search en_US
dc.description.abstract The power industries, especially thermal power plants, have large energy consumptions, which play an important role in energy conversion. In this study, the energy and economic analysis of Khartoum North power plant is presented. The primary Objectives of this research are to analyze the system components separately and to identify and quantify the energy. In addition, the effect of operation condition change will be presented. The study founded that increasing the mass flow rate of steam entering the boiler from 8.67kg/s to 10kg/s will increase the efficiency about 7.26% and increase power about 1.7MW and will effect in the fuel flow rate and increase the cost of fuel about 9$/hr. Since the efficiency of the plant is fundamentally limited by the ratio of the temperatures of the steam at turbine input and output, efficiency improvements require use of higher temperature, and therefore higher pressure steam throughout the study find that increasing the temperature at the outlet of the boiler from 811k to 850k will increase the efficiency about 2.13% and the power out of the turbine will increase about 0.5MW also will rise the cost of fuel 8$/hr. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject THERMO-ECONOMIC ANALYSIS en_US
dc.subject Thermal analysis en_US
dc.subject THERMO-ECONOMIC ANALYSIS OF STEAM PLANTS en_US
dc.title THERMO-ECONOMIC ANALYSIS OF STEAM PLANTS: CASE STUDY (KHARTOUM NORTH POWER STATION) en_US
dc.title.alternative تحليل حراري – اقتصادي للمحطات البخارية en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account