SUST Repository

Exergy Analysis of Combined Cycle Power Plant (GARRI”2” 180 MW)

Show simple item record

dc.contributor.author Mohieldein, Siddig Abuelgasim Abbas
dc.contributor.author Supervisor,- A. A. A.Abuelnour
dc.date.accessioned 2016-10-11T10:24:43Z
dc.date.available 2016-10-11T10:24:43Z
dc.date.issued 2016-01-10
dc.identifier.citation Mohieldein, Siddig Abuelgasim Abbas . Exergy Analysis of Combined Cycle Power Plant (GARRI”2” 180 MW) / Siddig Abuelgasim Abbas Mohieldein ; A. A. A.Abuelnour ; Khartoum: Sudan University of Science and Technology, college of Engineering, 2016 .- 71p. :ill ;28cm .-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/14292
dc.description Thesis en_US
dc.description.abstract In recent years the entire world is a warring about energy resources limitation, specifically Sudan country confronts critical crises in fossil fuel resources and yet more of electricity energy producing from fired thermal power plants. One from these plants Garri”2” combined cycle producing about 180MW. Exergy analysis in the light second law of thermodynamics is powerful tools to investigate from optimization of engineering devices. Exergy analysis has been carried out analytically for Garri”2” to evaluate exergetic efficiency and exergy destruction of each part; exergy balance and entropy generation calculated to achieve it .The results showed that combustion chambers are the main sources of exergy destruction due to high irreversibilities representing 63% from total exergy destruction, followed by gas turbines 13.6%, steam turbines 6.4%, heat recovery steam generators(HRSGs) 6.3%, stacks (exhaust gases) 4.7%, compressors 3.8% and cooling systems 2.3%. The results also showed that thermal and exergetic efficiencies for entire plant are (38%, 49%) respectively. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject mechanical engineering en_US
dc.subject power en_US
dc.subject Alaksergee analysis en_US
dc.subject Power plant en_US
dc.title Exergy Analysis of Combined Cycle Power Plant (GARRI”2” 180 MW) en_US
dc.title.alternative تحليل الإكسيرجي للدورة المشتركة في محطة الطاقة قري(2)(180MW) en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search SUST


Browse

My Account