dc.contributor.author |
Idriss, Aboubaker Idriss Bolad |
|
dc.contributor.author |
Supervisor,- Elkhawad Ali Elfaki |
|
dc.date.accessioned |
2016-05-30T09:51:38Z |
|
dc.date.available |
2016-05-30T09:51:38Z |
|
dc.date.issued |
2016-03-10 |
|
dc.identifier.citation |
Idriss , Aboubaker Idriss Bolad . Techno-Economical Feasibility Study for Establishment of a small Cement plant in South Darfur State / Aboubaker Idriss Bolad Idriss ; Elkhawad Ali Elfaki .- Khartoum: Sudan University of Science and Technology, college of Engineering, 2016 .- 68p. :ill. ;28cm .-M.Sc. |
en_US |
dc.identifier.uri |
http://repository.sustech.edu/handle/123456789/13542 |
|
dc.description |
Thesis |
en_US |
dc.description.abstract |
Darfur region is suffer from Problems of construction materials especially Cement, which considered as the most important item, since the region is so far from the Production areas and no local factories available in addition there security issues, all these problems led to increase the Cement prices, which in turm reflect at the people of the region. Darfur region potentially rich with the raw material for cement production (Marble and Poozzlna).This makes the region important in terms of investigation of the Feasibility of establishment of Cement Factories to resolve the problems. So the Study based on Techno- and Econo- Feasibility Study as a trial to solve these problem. The Technical part discussed the Equipment and Machinery upon the Geophysical Studies to ensure the quality and quantity of the raw material. However the economical part evaluates the project.The analysis results show the feasibility of the project ,that led to conclude the construction of Mini-Cement plant in the region to resolve the construction and development related problems in addition to the new market for local workforce and the indirect economical benefits from Such developmental projects. Nyala cement factory with a production capacity of 300 tons per day a pioneer Portland and poozzlana. Such a suggested factory in south Darfur, estimated by a cost of 115,074,00 $, and total annual profit 13461074.4$.if the estimation is true the factory will pay back the capital cost within a year , and also the project will provide annual taxes value of 7911765.6 $. |
en_US |
dc.description.sponsorship |
Sudan University of Science and Technology |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
Sudan University of Science and Technology |
en_US |
dc.subject |
Mechanical Engineering |
en_US |
dc.subject |
Cement Factory |
en_US |
dc.subject |
Cement industry |
en_US |
dc.subject |
Marble and Buzlana |
en_US |
dc.title |
Techno-Economical Feasibility Study for Establishment of a small Cement plant in South Darfur State |
en_US |
dc.title.alternative |
دراسة جدوي تقنية-اقتصادية لانشاء مصنع اسمنت صغير بولاية جنوب دارفور |
en_US |
dc.type |
Thesis |
en_US |