SUST Repository

Techno-Economical Feasibility Study for Establishment of a small Cement plant in South Darfur State

Show simple item record

dc.contributor.author Idriss, Aboubaker Idriss Bolad
dc.contributor.author Supervisor,- Elkhawad Ali Elfaki
dc.date.accessioned 2016-05-30T09:51:38Z
dc.date.available 2016-05-30T09:51:38Z
dc.date.issued 2016-03-10
dc.identifier.citation Idriss , Aboubaker Idriss Bolad . Techno-Economical Feasibility Study for Establishment of a small Cement plant in South Darfur State / Aboubaker Idriss Bolad Idriss ; Elkhawad Ali Elfaki .- Khartoum: Sudan University of Science and Technology, college of Engineering, 2016 .- 68p. :ill. ;28cm .-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/13542
dc.description Thesis en_US
dc.description.abstract Darfur region is suffer from Problems of construction materials especially Cement, which considered as the most important item, since the region is so far from the Production areas and no local factories available in addition there security issues, all these problems led to increase the Cement prices, which in turm reflect at the people of the region. Darfur region potentially rich with the raw material for cement production (Marble and Poozzlna).This makes the region important in terms of investigation of the Feasibility of establishment of Cement Factories to resolve the problems. So the Study based on Techno- and Econo- Feasibility Study as a trial to solve these problem. The Technical part discussed the Equipment and Machinery upon the Geophysical Studies to ensure the quality and quantity of the raw material. However the economical part evaluates the project.The analysis results show the feasibility of the project ,that led to conclude the construction of Mini-Cement plant in the region to resolve the construction and development related problems in addition to the new market for local workforce and the indirect economical benefits from Such developmental projects. Nyala cement factory with a production capacity of 300 tons per day a pioneer Portland and poozzlana. Such a suggested factory in south Darfur, estimated by a cost of 115,074,00 $, and total annual profit 13461074.4$.if the estimation is true the factory will pay back the capital cost within a year , and also the project will provide annual taxes value of 7911765.6 $. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject Mechanical Engineering en_US
dc.subject Cement Factory en_US
dc.subject Cement industry en_US
dc.subject Marble and Buzlana en_US
dc.title Techno-Economical Feasibility Study for Establishment of a small Cement plant in South Darfur State en_US
dc.title.alternative دراسة جدوي تقنية-اقتصادية لانشاء مصنع اسمنت صغير بولاية جنوب دارفور en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search SUST


Browse

My Account