SUST Repository

Implement Six Sigma in a Prefabricated Unit Construction Company

Show simple item record

dc.contributor.author Mahgoub, Nehal Abdel Azim Ahmed
dc.contributor.author Supervisor - Nadir Hassanein
dc.date.accessioned 2015-03-29T11:16:06Z
dc.date.available 2015-03-29T11:16:06Z
dc.date.issued 2011-01-02
dc.identifier.citation Mahgoub ,Nehal Abdel Azim Ahmed .Implement Six Sigma in a Prefabricated Unit Construction Company /Nehal Abdel Azim Ahmed Mahgoub ;Nadir Hassanein.-Khartoum: Sudan University of Science and Technology, College of Engineering, 2011.-55p :ill ;28cm .-M.Sc. en_US
dc.identifier.uri http://repository.sustech.edu/handle/123456789/10798
dc.description Thesis en_US
dc.description.abstract Six Sigma is a quality management approach which is looking for less cost, high quality, and continuous improvement and control. Data analysis of Six Sigma process depends on statistical methods which give visible and numerical values for defects, and high or poor control. The aim of this thesis is to apply Six Sigma methods to determine the problems that actually encountered the performance of a Sudanese construction company that executed a project consisting of prefabricated units to discover after executing the project that it had sustained high losses that could have been avoided if the company applied from the start Six Sigma methods. The objective of the study is to analyze the performance of the company to discover the reasons for the losses. The analysis and finding reasons of losses was obtained by using simple control charts which identified the defect and out of control points. And the final numerical results give the sigma values and efficiency of overrun material and workers cost. In this thesis, the writer suggests monitoring, time management, and continuous control actions for future improvements plans. The writer encourages adopting of Six Sigma methodology in Sudanese construction companies, even if it is started by using simple tools and methods to solve construction potential problems, and the promotion of these simple methods to reach executing complete Six Sigma projects. The thesis tries to explain some difficulties which can face its implementation, and key factors to a successful Six Sigma implementation. en_US
dc.description.sponsorship Sudan University of Science and Technology en_US
dc.language.iso en en_US
dc.publisher Sudan University of Science and Technology en_US
dc.subject . Civil Engineering en_US
dc.subject Construction Management en_US
dc.subject Construction companies en_US
dc.subject Six Sigma en_US
dc.title Implement Six Sigma in a Prefabricated Unit Construction Company en_US
dc.title.alternative في احدي الشركات الانشائية لانتاج وحدات المباني الجاهزة en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Share

Search SUST


Browse

My Account