Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/8293
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAbdelgafar, Ahmed Abuelqassim Abdelateef
dc.contributor.authorSupervisor - AL-Khawad Ali EL-Faki
dc.date.accessioned2014-11-27T12:45:42Z
dc.date.available2014-11-27T12:45:42Z
dc.date.issued2010-02-01
dc.identifier.citationAbdelgafar,Ahmed Abuelqassim Abdelateef .Optimization Through Simulation Of Manufacturing Process using ProModel Software/Ahmed Abuelqassim Abdelateef Abdelgafar;AL-Khawad Ali EL-Faki.-Kartoum:Sudan University of Science and Technology,College of Engineering,2010.-105P. : ill. ; 28Cm.-M.Sc.en_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/8293
dc.descriptionThesisen_US
dc.description.abstractYarmouk Industrial Complex administration (A 80 work shop- Doshka and clash manufacturing department) is facing problems in manufacturing two pieces of arms at the end of Doshka. These problems are summarize in reduced the rate of production, flow process bottlenecks, low utilization of machines, production time, production line in efficiency and production rejects . The research is focused an solve these problems through gathering the necessary information for the time of production in each station using stop watch , measuring distances between each machine and flow of production . Computer models were developed for these pieces through simulation of production line by using American computer package program ( ProModel), then corrected the models by using technicality to follow the process functioning that to make sure that the model are real in fact . After model simulation had been run to give us the expected results using in that promodel , then modifying the existing model by the suggested model in the stage of connecting the two pieces together by adding welding machine in ( A80 work shop –Doshka and clash manufacturing department ) r to make sure of the results give in this research , the results shows the following. 1- The monthly production rate increase from 85 pieces to 100 pieces. 2- Welding machine utilization increase from 59.74% to 96.47%. v 3- Idle time for welding process reduced from 40.26% to 3.53%. 4- Eliminate bottlenecks before welding stage. 5-To release and to make ease for the employment of the machine and the stations operation efficiency after linking the two pieces increases ( welding process from 59.74% to 96.47%- heat treatment1 process from 78.57% to 99.93%- bench work1 process from 21.11% to 75.96% - grinding process 39.61% to 81.63% - drilling process from 9.61% to 88.73% bench work2 from 2.91% to 91.89% - heat treatment2 from 85.51% to 92.82%, , reducing the inventory rate to be as the benefit of yarmouk industrial complexen_US
dc.description.sponsorshipSudan University of Science and Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectMechanical Engineeringen_US
dc.subjectManufacturing Processen_US
dc.subjectProModel Softwareen_US
dc.subjectYarmouk Industrialen_US
dc.titleOptimization Through Simulation Of Manufacturing Process using ProModel Softwareen_US
dc.title.alternativeتحسين نظام التصنيع بأستخدام المحاكاه بالحاسوب بواسطة برنامج ProModelen_US
dc.typeThesisen_US
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Optimization Through Simulation ...pdf
  Restricted Access
search4.92 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.