Please use this identifier to cite or link to this item:
https://repository.sustech.edu/handle/123456789/26015
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Obied, Hamam Abdelrahman Abdelmotalb | - |
dc.contributor.author | Supervisor, - Widatalla Alamin Abdalla | - |
dc.date.accessioned | 2021-04-07T06:15:42Z | - |
dc.date.available | 2021-04-07T06:15:42Z | - |
dc.date.issued | 2020-12-10 | - |
dc.identifier.citation | Obied, Hamam Abdelrahman Abdelmotalb . Productivity Improvement of Industrial Pipes Insulators / Hamam Abdelrahman Abdelmotalb Obied ; Widatalla Alamin Abdalla .- Khartoum: Sudan University of Science and Technology, College of Engineering, 2020.-66 p: ill;28cm.- M.Sc | en_US |
dc.identifier.uri | http://repository.sustech.edu/handle/123456789/26015 | - |
dc.description | Thesis | en_US |
dc.description.abstract | The production processes of heat insulation are studied in order to improve the productivity of the production plant. It has been found that to increase the productivity an improvement in the manual processes to a more efficient processes, equipment and tools should be done. The DMAIC methodology was used. Based on this methodology a tool was designed to simplify two processes (cutting and rolling process). Therefore, the cutting room was dispensed and the number of workers were reduced by two workers which was 11.1% of the total number of workers. The new model was designed and simulated by the Solid Work program. Based on simulation the time used for cutting and rolling to produce one piece with the new tool is estimated to be 3 minutes instead of 8 minutes and the new takt time was 5.53 minutes instead of 8.58 minutes. The previous production rate is 38 units per day (10,000 units per year), The new production rate is 59 units per day (15,500 units per year), the increase percentage of production is 55% more. | en_US |
dc.description.sponsorship | Sudan University of Science and Technology | en_US |
dc.language.iso | en | en_US |
dc.publisher | Sudan University of Science and Technology | en_US |
dc.subject | Mechanical Engineering | en_US |
dc.subject | Production | en_US |
dc.subject | Industrial Pipes Insulators | en_US |
dc.title | Productivity Improvement of Industrial Pipes Insulators | en_US |
dc.title.alternative | تحسين إنتاجية عوازل الأنابيب الصناعية | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Masters Dissertations : Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Productivity_Improvement_of_....pdf | Resaresh | 1.4 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.