Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/25729
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAbdulgani, Abubkr Eltayeb-
dc.contributor.authorAhmed, Akram Omer-
dc.contributor.authorMahmoud, Mahmoud Abu Elgasim-
dc.contributor.authorGeeb Allah, Samah Hassan-
dc.contributor.authorSupervisor, - Fatima Ahmed Albrair-
dc.date.accessioned2021-02-28T12:21:33Z-
dc.date.available2021-02-28T12:21:33Z-
dc.date.issued2020-11-01-
dc.identifier.citationAbdulgani, Abubkr Eltayeb.Production System Optimization by using Electrical Submersible Pump Case Study -Abugabra field-Sudan\Abubkr Eltayeb Abdulgani...{etal};Fatima Ahmed Albrair.-Khartoum:Sudan University of Science & Technology,College of Petroleum Engineering & Technology,2020.-50p.:ill.;28cm.-Bachelors Searchen_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/25729-
dc.descriptionBachelors Searchen_US
dc.description.abstractDuring the reservoir production life reservoir pressure will decline. Also after water breakthrough the fluid column weight will increase as hydrostatic pressure will increase because of increased water and oil mixture density. In this case, reservoir pressure may not be enough to lift up the fluid from bottom to the surface. These reasons decrease or even may cause to stop flowing of fluids from the well. Some techniques must be applied to prevent the production decline.A small change in water cut gives a large change in oil production. This study uses a simulated model of the PIPESIM artificial lift method based on the operating limits of the electrical submersible pump artificial lift technique applied to the MOGA well and SUF3 at the Abu GAbra field in Sudan. The results from the advanced simulation model show that the ESP solution gives a production rate ranging from (0-799.98 STB/D) a pump type (REDA D1050N 140 stages, 2916.7 RPM, 50 Hz) for a MOGA well and a production rate ranging from (0- 1500.202 STB/D) a pump type (REDA DN 1800 737 stages, 2916.7 RPM, 50 Hz) for a SUF3 well.en_US
dc.description.sponsorshipSudan University of Science & Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science & Technologyen_US
dc.subjectElectrical Submersible Pumpen_US
dc.subjectAbugabra fielden_US
dc.titleProduction System Optimization by using Electrical Submersible Pump Case Study -Abugabra field-Sudanen_US
dc.title.alternativeتحسين نظام الانتاج باستخدام المضخة الكهربائية الغاطسة-تطبيق في حقل ابوجابرة في السودانen_US
dc.typeThesisen_US
Appears in Collections:Bachelor of Petroleum Engineering & Technology

Files in This Item:
File Description SizeFormat 
Production System........pdfResearch1.58 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.