Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/24341
Title: Investigating Rise Of Voltage In Atbara-Portsudan Transmission Line
Other Titles: تقصي إرتفاع الجهد في خط النقل الرابط بين عطبرة وبورتسودان
Authors: Arzon, Mutaz Ibrahim Hassan
Supervisor, -ELmubarak Mohammed Mohammed Shamoug
Keywords: Engineering
Electrical Engineering
Investigating Rise
Voltage In Atbara-Portsudan Transmission Line
Issue Date: 15-Oct-2016
Publisher: Sudan University of Science and Technology
Citation: Arzon, Mutaz Ibrahim Hassan .Investigating Rise Of Voltage In Atbara-Portsudan Transmission Line \ Mutaz Ibrahim Hassan Arzon ; ELmubarak Mohammed Mohammed Shamoug .- Khartoum:Sudan University of Science and Technology,College of Engineering,2016.-43p. : ill. ; 28cm.-M.Sc.
Abstract: The Transmission Plan forms part of the National Electricity Corporation (NEC) Long Term Power System Planning Study (LTPSPS). The Transmission Plan for the Sudan for the period from 2006 to 2030. Identifies the required expansion of the NEC transmission system over the planning period to accommodate the power generation levels detailed in the Generation Plan Report and the levels of demand identified in the Demand Forecast Report. This report includes both the transmission system data and the results of detailed studies based on that data................................
Description: Thesis
URI: http://repository.sustech.edu/handle/123456789/24341
Appears in Collections:Masters Dissertations : Engineering

Files in This Item:
File Description SizeFormat 
Investigating Rise Of ....pdfTitle233.72 kBAdobe PDFView/Open
Research.pdf
  Restricted Access
Research4.25 MBAdobe PDFView/Open Request a copy
References .pdfReferences7.04 kBAdobe PDFView/Open
Appendix1 .doc.pdfAppendix65.63 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.