Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/19758
Full metadata record
DC FieldValueLanguage
dc.contributor.authorEisa, Waleed Hamed Ahmed-
dc.contributor.authorSupervisor, -Naomie Bt Salim-
dc.date.accessioned2018-01-02T09:31:00Z-
dc.date.available2018-01-02T09:31:00Z-
dc.date.issued2017-11-07-
dc.identifier.citationEisa, Waleed Hamed Ahmed .Prediction of the Generated Amount of Power From a Thermal Power Plant Using Data Mining /Waleed Hamed Ahmed Eisa ;Naomie Bt Salim .-Khartoum:Sudan University of Science & Technology, College of Computer Science and Information Technology ,2017.-183p.:ill.;28cm.-M.Scen_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/19758-
dc.descriptionThesisen_US
dc.description.abstractElectricity has changed everyone's life since the day it was discovered. It is produced all over the world in power plants that uses different types of energy sources like fossil fuel, water falls, nuclear and wind Energy. The amount of electricity produced is the fundamental goal for any power plant. Therefor accurate prediction of this amount is very important for planning and operation activities of the power plant. This study aims to identify the attributes that influence the amount of generated power from a thermal power plant, and to accurately predict that amount. Datasets were prepared form real data that had been collected by SCADA over two years period, from two different units in a thermal power plant of 190 MW capacity. Feature selection was done using wrapper method, and power prediction was done using all available attributes, to give a ranking of the selected attributes, and show the influence of each parameter in the amount of generated power. For power prediction, only controllable parameters like pressure, temperature and steam flow at turbine inlet were used as predictors. Sixteen different algorithms were tested for each dataset, the algorithm that showed higher correlation coefficient and minimum error was selected to build the modelThe predicted amount using data mining was found to be more accurate than manufacturers expectations and thermodynamic laws. Models evaluation was done using separate dataset, and cross validation in case of small datasets. Moreover comparison between the predicted and the actual observed amounts was presented in a graph, to visualize the accuracy of the models.en_US
dc.description.sponsorshipSudan University of Science & Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science & Technologyen_US
dc.subjectPower Planten_US
dc.subjectGenerated Amounten_US
dc.titlePrediction of the Generated Amount of Power From a Thermal Power Plant Using Data Miningen_US
dc.title.alternativeالتنبؤ بكمية الطاقة الكهربائية المنتجة من محطة توليد حراري بإستخدام التنقيب في البياناتen_US
dc.typeThesisen_US
Appears in Collections:PhD theses : Computer Science and Information Technology

Files in This Item:
File Description SizeFormat 
Prediction of the.pdfResearch4.67 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.