Please use this identifier to cite or link to this item: https://repository.sustech.edu/handle/123456789/19263
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAbdelgadir, Alaa Abdulanasir-
dc.contributor.authorHassan, Eiman Kamal-
dc.contributor.authorMohammed, Mohammed Abdallah-
dc.contributor.authorOmer, Omer Mohammed-
dc.contributor.authorAhmed, Tarig Mamoun-
dc.contributor.authorSupervisor, -Mohanned Mahjoup Mohammed-
dc.date.accessioned2017-12-05T08:50:30Z-
dc.date.available2017-12-05T08:50:30Z-
dc.date.issued2017-10-07-
dc.identifier.citationAbdelgadir, Alaa Abdulanasir . Design of A new Field Pipeline From Rawat field to Al-Jabalain \ Alaa Abdulanasir Abdelgadir , Eiman Kamal Hassan ..{etal} ; Mohanned Mahjob Khairy .-khartoum: Sudan University of Science & Technology, College of Petroleum Engineering and Technology, 2017.- 43 P:ill; 28cm.-Bachelors searchen_US
dc.identifier.urihttp://repository.sustech.edu/handle/123456789/19263-
dc.descriptionBachelor Researchen_US
dc.description.abstractPiping systems are the most important transmission method in oil industry that help distribution of the natural resources over different regions. This thesis was prepared in order to give detailed characterization of pipeline design process from the new Rawat field to Al-Jabalain CPF. This study focus on determining the optimum route and diameter by using PIPESIM simulation and GIS technique. The design process is significantly impacted by the fluid properties , geological factors ,pumping system , pressure drop in the pipeline , selected material , environment and regulation , and took into account the expected problems that may face the design and construction phase. The design results conclude two routes scenarios. The first scenario is an ideal straight line that does not consider any design factors. The second scenario (real situation) took into account all the factors affecting the route establishing and the obstacles faced, an estimation of the cost for thereal scenario pipeline was done.en_US
dc.description.sponsorshipSudan University of Science & Technologyen_US
dc.language.isoenen_US
dc.publisherSudan University of Science and Technologyen_US
dc.subjectPetroleum Engineering and Technologyen_US
dc.subjectField Pipeline From Rawaten_US
dc.subjectfield to Al-Jabalainen_US
dc.titleDesign of A new Field Pipeline From Rawat field to Al-Jabalainen_US
dc.title.alternativeتصميم لخط انابيب من حقل الراوات الي الجبلينen_US
dc.typeThesisen_US
Appears in Collections:Bachelor of Petroleum Engineering & Technology

Files in This Item:
File Description SizeFormat 
Design of A new ... .pdfResearch1.26 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.